Laserfiche WebLink
Hidden Hollow Planning Commission Report <br />April 21, 2004 <br />Page 4 <br /> <br />Soils: A total of nine soil test borings were put down on the site in June of 2003. (Refer to <br />the graphic below for specific boring locations.) The borings revealed a generalized profile of <br />topsoil underlain by course alluvium. The topsoil, a mixture of organic silty sand, extended to <br />depths of one foot to three feet in places. Groundwater was encountered at shallow depths <br />of two to four feet, however this should not pose any problems as the depth of the <br />groundwater would be well below the basement levels of the homes after the site has been <br />filled and balanced. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Recommendation: <br /> <br />Hold the public hearing and discuss the proposed preliminary plat and the associated issues <br />surrounding the subdivision. Staff review and the engineer’s review revealed no deficiencies <br />and thus a resolution recommending approval of the preliminary plat has been drafted for <br />your action if the Commission so desires.