Laserfiche WebLink
CVS Report <br />May 5, 2004 <br />Page 3 <br /> <br />Development Review Discussion: <br /> <br />Setbacks: As stated, the proposed building does meet setback requirements. Below is a <br />chart displaying the required and proposed building and parking setbacks for the CVS <br />building: <br /> <br />Building Setbacks Required Proposed Compliance <br />Front (Highway 10) 30 feet 75 feet Yes <br />Front (Silver Lake Rd) 30 feet 115 feet Yes <br />Side (south) (abuts Res.) 20 feet 21 feet Yes <br />Rear (west) 20 feet 46 feet Yes <br /> <br />Parking Lot Setbacks <br />Front (Highway 10) 5 feet* 5 feet Yes <br />Front (Silver Lake Rd.) 5 feet* 5 feet Yes <br />Rear (west) 2 feet* 65 feet Yes <br /> <br />*This property was granted a parking setback variance in November of 2003. <br /> <br />Parking: The proposed site plan shows a total of 88 regular parking stalls and 3 handicapped <br />parking stalls. The Code requires one stall for every 100 square feet of retail sales area, <br />plus one for every employee. The CVS Pharmacy would have 9898 square feet of retail <br />area and roughly 7 employees during one shift. Based on Code requirements, this <br />development would be required to have 106 parking stalls. The proposed parking does not <br />satisfy this requirement. The Code, however, has a provision for proof of parking. Section <br />1121.14 of the Zoning Code allows a reduction in parking area if approved by the City <br />Council. To be considered for a reduction, there are requirements that must be met, <br />including that the space must be designated as proof of parking and not used for other uses. <br />In addition, the number of reduced spaces cannot exceed 15% of the required amount. In <br />this case, 15% of the required amount is 16 stalls. The proposed parking is 18 stalls short of <br />the requirements, therefore, in order to meet the code requirements, 2 additional stalls will <br />need to be added and a proof of parking area will need to be designated with room for 16 <br />stalls. Staff is recommending that the 2 additional spaces be added along the northeast side <br />of the building. The proof of parking could possibly be located near the pond area, if that <br />area were redesigned to accommodate it. <br /> <br />Drainage: The site would be serviced by a series of catch basins that drain into an on-site <br />infiltration pond. There would be a culvert in the infiltration pond that connects to a larger <br />adjacent pond. The larger pond has been designed to contain water up until the 100-year <br />storm level. If the water level were ever to reach the 100-year level or higher, there is a <br />culvert at the high water mark that would then drain the overflow water to the Highway 10 <br />median. The developer has been given permission by Ramsey County to utilize the median <br />for this purpose. Before any construction is to occur, the developer will need to submit to the <br />City copies of all required county permits. The Public Works department and SEH, the City’s <br />engineering consultant, are reviewing the grading and draining plans, although staff is not <br />anticipating any problems with the drainage as proposed. The developer submitted the <br />plans to Rice Creek Watershed on April 8, 2004. City approval will of course be contingent <br />upon Rice Creek Watershed’s approval. <br />