My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2018/09/10
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2018
>
Agenda Packets - 2018/09/10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:58 PM
Creation date
9/12/2018 2:58:04 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
9/10/2018
Supplemental fields
City Council Document Type
City Council Packets
Date
9/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 8J <br />Meeting Date: September 10, 2018 <br />Mo ,S vI�� 1' 1� Type of Business: CB <br />Administrator Review:• <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Don Peterson, Public Works Director <br />item Title/Subject: Resolution 9107, Approving Additional Expenses for Rest <br />Room/Mechanical Building for the Splash Pad at City Hall <br />Park <br />Background/Discussion: <br />City Council approved the installation of a new Play Ground and Splash Pad at City Hall <br />Park. <br />Material and components of the splash pad have begun to arrive. The plumbing contractor <br />inspected the pump and controls for the splash pad. Upon review of the equipment, it was <br />discovered that the proposed building size, to house the equipment, would not be <br />adequate for the pump and controls. <br />Staff along with the contractors, have reviewed and discussed the situation with the <br />manufacture of the pump and controls to determine what options would be optimal. <br />It was agreed that an increased building size from a 20'x20' to 20'X26' would remedy the <br />equipment housing situation. Minnesota/Wisconsin Playground is the main contractor and <br />worked with both the manufacture of the pump and controls and the building supplier to <br />resolve this issue at the lowest financial impact to the City. <br />The increased cost of the larger building will be $17,335.00 along with $11,956.00 for <br />concrete, labor and freight; totaling $29,291.00. <br />Recommendation: <br />Accept the proposal from Minnesota Wisconsin Playground for the revised building <br />expansion at a cost of $17,335.00 along with $11,956.00 for concrete, labor and freight; <br />totaling $29,291.00 to be funded from account 480-4470-7050. <br />Respectfully submitted, <br />Don Peterson, Public Works Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.