Laserfiche WebLink
Fund: 700 Department:4823 Water Infrastructure & Equipment Maintenance <br />Account <br />Description <br />2016 <br />2017 <br />2018 <br />2019 <br />Description <br />3220 <br />Natural gas <br />7,000 <br />7,500 <br />7,500 <br />8,500 <br />Heating fuel <br />7,000 <br />7,500 <br />7,500 <br />8,500 <br />3610 <br />Memberships <br />100 <br />100 <br />100 <br />120 <br />MN Rural Water Association (50%) <br />80 <br />80 <br />80 <br />100 <br />MN Safety Council (19% of $405) <br />50 <br />50 <br />50 <br />60 <br />Suburban Utility Superintendent Association (SUSA)(50% of $100) <br />60 <br />60 <br />60 <br />80 <br />Pressurized vessel license <br />290 <br />290 <br />290 <br />360 <br />3630 <br />Training <br />250 <br />250 <br />250 <br />250 <br />Computer training/webinars <br />1,200 <br />1,200 <br />1,200 <br />1,700 <br />Trench safety/confined space alternate years/inspection safety <br />110 <br />110 <br />110 <br />110 <br />Hearing test/R2K (2.15 FTE * $50) <br />60 <br />60 <br />60 <br />60 <br />Maintenance Expo <br />820 <br />820 <br />820 <br />1,500 <br />Water operator class/exam/certificate ($xxx per person) <br />200 <br />200 <br />200 <br />200 <br />Misc. training seminars <br />390 <br />390 <br />390 <br />390 <br />Equipment operator training <br />200 <br />200 <br />200 <br />200 <br />MRWA workshops <br />560 <br />560 <br />560 <br />560 <br />Tuition reimbursement <br />60 <br />60 <br />60 <br />60 <br />Work zone safety seminar (every 3 years) <br />3,850 <br />3,850 <br />3,850 <br />5,030 <br />4010 <br />Rental, equipment <br />4,000 <br />4,000 <br />4,000 <br />4,000 <br />Skid steer - upgrade <br />300 <br />300 <br />300 <br />300 <br />Barricades & signs <br />200 <br />200 <br />200 <br />200 <br />Tools & equipment <br />4,500 1 <br />4,500 <br />4,500 <br />4,500 <br />4800 <br />Insurance <br />10,230 <br />10,230 <br />10,230 <br />10,230 <br />Share of property/liability insurance <br />10,230 <br />10,230 <br />10,230 <br />10,230 <br />5110 <br />Repairs, buildings & grounds <br />2,000 <br />2,000 <br />2,000 <br />2,000 <br />Door & lock repairs <br />1,000 <br />1,000 <br />1,000 <br />1,000 <br />Roof & wall repairs <br />3,000 <br />7,540 <br />7,540 <br />7,540 <br />Electrical & mechanical repairs (well #2 in 17 well #4 in 18 $4540) <br />1,000 <br />1,000 <br />1,000 <br />1,000 <br />Site repairs (pavement, fence, irrigation, etc...) <br />7,000 <br />11,540 <br />11,540 <br />11,540 <br />5120 <br />Repairs, vehicles <br />1,000 <br />1,000 <br />1,000 <br />1,800 <br />Utility trick repairs (add $800 for rear springs) <br />1,000 <br />1,000 <br />1,000 <br />1,800 <br />5130 <br />Repairs, equipment <br />1,500 <br />1,500 <br />1,500 <br />1,500 <br />Well and water treatment plant repairs <br />1,500 <br />1,500 <br />1,500 <br />1,500 <br />Miscellaneous repairs (Backhoe, Skid steer) <br />- <br />3,000 <br />3,000 <br />3,000 <br />Repair boiler @ main plant <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />Generator service - Onan <br />2,500 <br />2,500 <br />2,500 <br />2,500 <br />VFD service <br />1,500 <br />1,500 <br />1,500 <br />1,500 <br />Meter and valve repairs <br />2,000 <br />2,000 <br />2,000 <br />2,000 <br />SCADA repairs <br />100 <br />100 <br />100 <br />100 <br />Radio repairs <br />12,600 <br />15,600 <br />15,600 <br />15,600 <br />5140 <br />Repairs, streets <br />10,000 <br />10,000 <br />10,000 <br />10,000 <br />Contractor repairs to streets after water main breaks <br />10,000 <br />10,000 <br />10,000 <br />10,000 <br />5150 <br />Repairs, utilities <br />5,000 <br />5,000 <br />5,000 <br />5,000 <br />Fire hydrant repairs <br />5,000 <br />5,000 <br />5,000 <br />5,000 <br />Gate valve repairs <br />7,500 <br />7,500 <br />7,500 <br />7,500 <br />Water main repairs <br />17,500 <br />17,500 <br />17,500 <br />17,500 <br />5155 <br />Water service repairs <br />65,000 <br />65,000 <br />65,000 <br />65,000 <br />Contractor repairs to residential water services. <br />15,000 <br />15,000 <br />15,000 <br />15,000 <br />Pavement & curb repairs <br />80,000 <br />80,000 <br />80,000 <br />80,000 <br />5160 <br />System maintenance <br />3,500 <br />3,500 <br />3,500 <br />31500 <br />Water system maintenance & repair items <br />- <br />- <br />- <br />- <br />Well #4 perimeter fencing ($5000 well #5 fencing defer to 2018) <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />7030 <br />Capital, equipment > $5000 <br />15,000 <br />15,000 <br />15,000 <br />15,000 <br />Gate valves <br />31,958 <br />42,640 <br />- <br />- <br />SCADA system upgrades (automatic controls) <br />35,000 <br />35,000 <br />35,000 <br />35,000 <br />Booster station (pressure valve) <br />10,000 <br />- <br />- <br />- <br />Water treatment plant (leaking valve) <br />14,000 <br />- <br />- <br />- <br />Trench box <br />2,750 <br />- <br />- <br />- <br />Electric rain gauges SCADA System (33%)(total cost $8,250) <br />25,000 <br />- <br />- <br />- <br />Security cameras & card key access <br />- <br />35,000 <br />- I <br />- <br />3/4 ton pick-up <br />133,708 <br />127,640 <br />50,000 <br />50,000 <br />7050 <br />Constriction > $25000 <br />80,000 <br />- <br />- <br />- <br />Wells #6 building repairs (int. and exterior repairs) <br />- <br />12,000 <br />- <br />- <br />Well #5 repairs (design in 2017)($90,000 defer to 2018) <br />- <br />- <br />- <br />400,000 <br />Water treatment plant engineering and design <br />25,000 <br />- <br />- <br />Water system upgrades wells #1,2 <br />- <br />45,000 <br />50,000 <br />50,000 <br />Well pump rehabilitation project (well no. 6) <br />105,000 1 <br />57,000 <br />50,000 <br />450,000 <br />45 <br />