My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-05-2018 WS
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2018
>
11-05-2018 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:55 PM
Creation date
11/1/2018 11:35:42 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/5/2018
Supplemental fields
City Council Document Type
City Council Packets
Date
11/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INDEX <br />I. Building/Community Development Fees <br />ll. Other Inspection / Planning Fees <br />Ill. Miscellaneous (copies, maps, agenda, etc.) <br />IV. Police/Administrative Offenses <br />V. Licenses <br />Vl. Parks, Recreation, and MVCC Facility Rental Fee <br />VII. Public Works/Municipal Utility Fees <br />Appendix A — 2017 MN State Statutes: 3268.153 Building Permit Fees <br />Appendix B — 2017 MN State Statutes: 3268.148 Surcharge <br />'age 2 <br />'age 3 <br />'age 4 <br />'age 4 <br />'age 5 <br />'age 7 <br />'age 8 <br />I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES <br />Building Permit (State Surcharge Required, See <br />Appendix B) <br />Fees shall be based according to the 2017 State <br />Statute 326B.153 and are determined by the City's <br />Building Official (Appendix A) <br />Permit Plan Review <br />65% of Building Permit Fee <br />-Building <br />Building Permit Reinspection <br />$63.25 per State Statute 3268.153 <br />Building Permit Investigation Fee (starting work <br />without an approved/issued permit) <br />Equivalent to permit fee <br />Renewable Energy System (Solar Geothermal, <br />Wind Energy Conversion) — Residential <br />$100 <br />Renewable Energy System (Solar Geothermal, <br />Wind Energy Conversion) — Commercial <br />See Appendix A <br />Billboards/Billboard Alterations (includes Footings) <br />$250 per billboard plus surcharge <br />Telecommunications Antenna — New System <br />$750 plus engineering/inspection fees if located on <br />City -owned property plus surcharge (see Public <br />Works for further information) <br />Telecommunications Antenna — Repairs/ <br />Alterations/Swapping or Adding Antennas to <br />Existing System (City or Private Property) <br />$250 per permit plus surcharge <br />Electrical Permits, State of MN <br />Established by the Minnesota State Boards of <br />Electricity <br />Fire Inspections (DHS) <br />50 <br />Fire Panel Systems <br />See Appendix A <br />Fire Permit (no surcharge), All permits unless noted <br />otherwise <br />$100 <br />Fireworks Display/Fireworks Sales <br />$100 <br />Fireworks Sales Only (Businesses) <br />$350 <br />Fireworks Sales with other Retail (Businesses) <br />$100 <br />Fire Permit, Temporary Tent <br />$50 <br />Fire Permit, Tank Installation (fuel, oil, gas, etc.) <br />$100 per tank <br />Fire Permit, Tank Removal <br />$50 per tank <br />Fire Permit, Operational <br />$50 per year <br />Fire Permit, Chemical Fire Suppression <br />$100 <br />Fire Sprinkler Systems <br />See Appendix A <br />Fire Sprinkler Plan Check <br />65% of permit (for new construction or 20 heads or <br />more only) <br />Mechanical Permit, Residential (State Surcharge <br />Required, See Appendix B) <br />Minimum $60 or 2% of Valuation, whichever is larger <br />Mechanical Permit, Commercial (State Surcharge <br />Required, See Appendix B) <br />See Appendix A <br />2019 Mounds View Fee Schedule Page 2 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.