Laserfiche WebLink
2019 Mounds View Fee Schedule Page 12 of 13 <br />Sewer Inspection No charge if during normal business hours, otherwise <br />one hour at call-out rate per visit <br />Sewer Re-Inspection One hour at call-out rate per visit <br />Surface Water Management (SWM) Utility Fees (Chapter 908) <br />SWM New Construction, R-1 $212 per lot <br />SWM New Construction, R-2 $1,038 per acre <br />SWM New Construction, R-3, R-4, R-O $1,500 per acre <br />SWM New Construction, B-1, B-2, B-3, B-4 $1,500 per acre <br />SWM New Construction, I-1, PUD $2,096 per acre <br />SWM Utility Rate Charge, R-1 Single Family and R- <br />2 Single and Two Family Residential <br />$11.00 12.00 per unit per quarter <br />SWM Utility Rate Charge, R-3 Medium Density <br />Residential <br />$60.14 65.61 per acre per quarter <br />SWM Utility Rate Charge,R-4 High Density <br />Residential, R-5 Mobile Homes and R-O Residential <br />Office <br />$71.32 77.81 per acre per quarter <br />SWM Utility Rate Charge,B-1 Neighborhood <br />Business, B-2 Limited Business, B-3 Highway <br />Business and B-4 Regional Business <br />$93.42 101.92 per acre per quarter <br />SWM Utility Rate Charge, I-1 Industrial $72.93 79.57 per acre per quarter <br />SWM Utility Rate Charge, PUD Planned Unit <br />Development <br />$82.71 90.24 per acre per quarter <br />SWM Utility Rate Charge, CRP Conservancy, <br />Recreation and Preservation <br />$10.16 11.08 per quarter <br />SWM Utility Rate Charge, School or Church, Public <br />or Private <br />$33.57 36.62 per quarter <br />Street Lighting Utility Fees (Chapter 904) <br />Residential (single family homes, duplexes, <br />fourplexes, condominium and townhomes) <br />$4.50 per unit per quarter <br />Commercial/Industrial $21.09 per acre per quarter <br />Institutional/Charitable $21.09 per acre per quarter <br />Apartments $21.09 per acre per quarter <br />Construction Site and Land Disturbance Fees (Ordinance 804, Chapter 1303) Additional Fees <br />May be Required for Legal and Engineering Costs Incurred by the City. <br />50 Cubic Yards or Less $25 <br />51 to 100 Cubic Yards $50 <br />101 to 1,000 Cubic Yards $50 base fee plus $20 for each 100 cubic yards or <br />fraction thereof <br />1,001 to 10,000 Cubic Yards $250 base fee plus $35 for each 1,000 cubic yards or <br />fraction thereof <br />10,001 to 100,000 Cubic Yards $500 base fee plus $100 for each 10,000 cubic yards <br />or fraction thereof <br />100,001 Cubic Yards or More $1,500 base fee plus $250 for each 100,000 cubic <br />yards or fraction thereof <br />Other Miscellaneous Public Works Fees (Actual Time is Rounded up to the Nearest Full Hour) <br />Load Limit Waiver (Authorized by Public Works <br />Director) <br />$25 125 per trip <br />Call-Out Charge for Contractor Negligence (Lack of <br />Maintenance, Traffic Signs, Etc.) <br />Actual time at call-out rates <br />Water Tower Telecommunications Maintenance or <br />Repair Access Fee <br />No charge if during normal business hours, otherwise <br />actual time at call-out rate 2 hour minimum charge <br />for each after hours call-out <br />Water Tower Telecommunications Plan Review and <br />Inspections <br />Actual legal and consulting engineering costs plus <br />10% management fee ($500 minimum) $125 for <br />administration costs and $500 escrow.