Laserfiche WebLink
05/06/95 17:29 FAX 612 490 2150 SEH 5T. PAUL <br />MOUNDSVIEW, MINNESOTA <br />PAVEMENT MANAGEMENT <br />BASED ON 1992 RATINGS, UP DATED WITH 92-94 IMPROVMENTS <br />PERCENT <br />ROADS <br />JNTY/CSAH <br />0 <br />NOTHING 1) 2.00 5 6% 0 <br />JTINE MAINT_ 2) 10.00 d?g P. % 13,787 <br />kLCOAT 3) 21.61 60 ,7 % 673,656 (4) <br />ONSTRUCT 2.00 6 % 799,924 (5) <br />3.5.61 100.00% 1,487,367 <br />BASED ON 1992 RATINGS REVISED TO INCLUDE 1992 TO 1994 <br />PROJECTS (SEAL COATING, PATCHING, ETC,), PROPOSED <br />IMPROVMENTS ARE BASED ON THE FOLLOWING RATING <br />BREAKDOWN: <br />ROUTINE MAINT. <15 <br />SEAL COATING 16 TO 40 <br />RECONSTRUCTION >40 <br />1) 92 RATINGS INDICATE MINOR <br />IMPROVEMENTS THAT WERE <br />COMPLETED AS CITY PROJECTS <br />FROM 1992 TO 1994 <br />2) INCLUDES CRACK FILLING AND <br />PATCHING <br />3) INCLUDES CRACK FILLING, <br />PATCHING AND SEALCOATING <br />4) COST INCLUDES : <br />PATCHING 13.0,754 <br />CRACK <br />FILLING 295,349 <br />SEAL <br />COATING 247,553 <br />5) BASED ON $400,000/MILE <br />Q002/002