My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1995/03/08
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1995
>
Agenda Packets - 1995/03/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:49 PM
Creation date
11/27/2018 1:32:56 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
3/8/1995
Supplemental fields
City Council Document Type
City Council Packets
Date
3/8/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ar 3535 VADNAIS CENTER DRIVE, 200 SEH CENTER, ST. PAUL, MN55110 6124902000 800325-20.55 <br />ARCHITECTURE ENGINEERING ENVIRONMENTAL TRANSPORTATION <br />January 16, 1995 RE: Mounds View, Minnesota <br />Silver Lake Road Sidewalk and Drainage Facilities <br />SEH No. A-MOUND9505.00 <br />Mr. Mike Ulrich <br />Director of Public Works <br />City of Mounds View , <br />2466 Bronson Drive <br />Mounds View, MN 55112 <br />Dear Mike: <br />In accordance with our recent discussions, we are pleased to submit this proposal for engineering <br />services associated with the study and preparation of a feasibility report for the construction of a <br />sidewalk and related drainage improvements along Silver Lake Road between County Road H and <br />County Road I. Services will be provided in accordance with our Agreement for Professional <br />Engineering Services dated November 17,1993, herein called the Agreement. <br />This work was initially proposed to include the sidewalk construction only. However, upon <br />review, it was noted that the proposed sidewalk alignment would impact several adjacent wetland <br />areas and traverses several drainage improvements projects which have been identified in the Local <br />Water Management Plan (LWMP). It was then determined that the proposed drainage <br />improvements should be included in a study to provide a more comprehensive review of the project <br />area needs. <br />These basic improvements to be presented in the study are as follows: <br />1. Feasibility of the proposed sidewalk construction. <br />2. Feasibility of Project EW -1 identified in the LWMP (see Attachment #1). <br />3. Feasibility of Project SC -2 identified in the LWMP (see Attachment #1). <br />4. Feasibility of the Silver View sediment pond (see Attachment #1). - <br />Other related items to be included in the study: <br />1. Delineations of the boundaries of affected wetlands. <br />2. Discussion of any special permitting requirements. <br />3. Proposed construction phasing for all identified improvements. <br />4. Cost estimates for all identified improvements. <br />5. Identification of available funding sources. <br />Upon completion of the study, we will prepare text describing our findings and recommendations <br />which, together with maps and drawings generated during the study, will be bound into a report <br />for presentation to the Council, staff and other interested parties. <br />SHORTELLIOrrHENDRICKSON I
The URL can be used to link to this page
Your browser does not support the video tag.