Laserfiche WebLink
TABLE W-2 <br />MAJOR MAINTENANCE SCHEDULE <br />Frequency <br />of Service Estimated Annualized <br />Unit Service Description in Years Service Cost Service Cost <br />Well No. 1 Motor and Pump Service 7 16,000 2,290 <br />Meter Service 7 800 115 <br />Well No. 2 Overhead Motor 7 5,000 715 <br />Pump Service 7 16,700 2,390 <br />Meter Service 7 800 115 <br />Well No. 3 Motor and Pump Service 7 15,000 2,145 <br />Meter Service 7 500 70 <br />Well No. 4 Inspect Well, Pump & Motor 7 5,600 800 <br />Well No. 5 Motor and Pump Service 7 8,500 1,215 <br />Meter Service 7 500 70 <br />Well No. 6 Motor and Pump Service 7 16,000 2,290 <br />Meter Service 7 500 70 <br />Treatment Plant 1 Filter Service 7 500 170 <br />Compressor/Atometer 3 600 200 <br />Paint Tanks and Pipes 14 15,000 1,070 <br />Treatment Plant 2 Filter Service 3 200 70 <br />Compressor/Atometer 3 300 100 <br />Paint Tanks and Pipes 14 15,000 1,070 <br />Treatment Plant 3 Filter Service 3 </ 200 70 <br />Compressor/Atometer 3 ' 300 100 <br />Paint Tanks and Pipes 14 J i 15,000 1,070 <br />Tower 1 Clean and Inspect 3 2,100 700 <br />Clean and Repair 14 25,000 1,790 <br />Tower 2 Clean and Inspect 3 2,100 700 <br />Clean and Repair 14 25,000 1,790 <br />Ground Reservior Clean and Inspect 3 5,100 1,700 <br />Repair Tank 14 30,000 2,140 <br />Repair Roof 14 20,000 1,425 <br />Repair Brick Veneer 7 4,900 700 <br />Hydrants Clean, Repair & Replace 7 42,000 6,000 <br />Gate Valves Repair and Replace 7 28,000 4,000 <br />Watermain Clean and Repair 7 35,000 5,000 <br />TOTAL 42,500 <br />7