Laserfiche WebLink
Item 05C <br />Page 9 <br /> <br /> <br />3: Proposed crosswalk across Co Rd H. Proposed sidewalk (yellow line) will follow Track & Field fence and alongside proposed <br />driveway to school building (Photo Oct 30, 2018). <br /> <br />4: East parking lot, looking NW. Storm water storage units will be installed below the parking lot, raising the grade to building <br />level. East parking lot will be used for bus loading and vehicle parking (Photo Oct 30, 2018).