Laserfiche WebLink
VI. WATER, SEWER, STREET AND OTHER FEES <br /> -~e~--e€-t~+~ <br />Load Limits Permit Fee $25/entry/truck <br />Right of Way Permit Fees Yearly Registration Fee: $25.00 <br /> Excavation Permit Fee: $125.00 <br /> Obstruction Permit Fee: $50.00 <br /> Permit Extension: $25.00 <br /> ROW Security Fee: Subject to the Discretion of <br /> the Public Works Director. <br />Street Opening Permit $125 permit fee plus $1000 Security Fee <br />Land Disturbance Fees (i.e., excavating, <br />50 cubic yards or less ............................$29.00 <br />grading, filling) <br /> 51 to 100 cubic yards.. .$44.00 <br /> 101 to 1000 cubic yards ........................$44.00 <br /> for the first 100 cubic yards, plus $21.00 for each <br /> additional 100 cubic yards or fraction thereof. <br /> 1001 to 10,000 cubic yards ..................$226.00 <br /> for the first 1000 cubic yards, plus $18.00 for each <br /> additional 1000 cubic yards or fraction thereof. <br /> 10,001 to 100,000 cubic yards ...............$377.00 <br /> for the first 10,000 cubic yards, plus $78.00 for <br /> each additional 10,000 cubic yards or fraction <br /> thereof. <br /> 100,001 cubic yards or more ..............$1,064.00 <br /> for the first 100,000 cubic yards, plus $44.00 for <br /> each additional 100,000 cubic yards or fraction <br /> thereof. <br /> ("Applicant maybe responsible for any City <br /> engineering costs) <br />Sewer Fees <br />Availability Charge (SAC) $~,§7a 1 825 (effective 1/1/8 08 per <br /> Metropolitan Council Environmental Services. <br />Sewer Charge <br /> Service Charge per Residential Equivalent <br />Residential Rates Connection $21.58 per Quarter plus Usage Rate <br /> Based on Metered Water Usage $1.72 per 1,000 <br /> gallons <br />28 <br />