Laserfiche WebLink
May 3, 2010 Construction Begins (Phase 2) <br />July /August, 2010 Placement of Bituminous Wear Surface (Phase 1) - Optional' <br />September 13, 2010 Start 2012 Street and Utility Improvement Project <br />October, 2010 Construction Completed (Phase 2) <br />July /August, 2011 Placement of Bituminous Wear Surface (Phase 2) - Optional* <br />* -The City may allow the bituminous wear surface to be placed during the calendar year that <br />the based course is placed, provided several conditions are met. These conditions pertain to the <br />amount and depth of excavation that occurred under the streets, the ambient air temperature at <br />the time of paving, and actual mixture temperature at the time of paving. <br />