My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2018/11/13
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2018
>
Agenda Packets - 2018/11/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:07 PM
Creation date
4/2/2019 10:14:01 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/13/2018
Supplemental fields
City Council Document Type
City Council Packets
Date
11/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A <br />MN <br />9 <br />2 3 4 • • 4 • • 4 • • 7 • • 8 • • a • • to <br />GENERAL NOTES <br />DISTANCE SHALL BE MEASURED FROM THE OUTER EDGE OF THE PIPE TO THE OUTER EDGE OF <br />THE CONTAMINATION SOURCE (OUTER EDGE OF STRUCTURES OR PIPING OR SIMILAR). <br />LEGEND <br />1. ALL CONSTRUCTION MUST COMPLY WITH APPLICABLE STATE AND LOCAL ORDINANCES, <br />17. SPOT ELEVATIONS SHOWN IN PARKING LOTS, DRIVES AND ROAD$ INDICATE GUTTER GRADES, <br />1.) Top of top nut of tiro hydrant on West side of Ed9awood Ave -between 5101 and 5139 <br />UNLESS NOTED OTHERWISE. SPOT ELEVATIONS WITH LABELS OUTSIDE THE BUILDING <br />- ----- EXISTING CONTOUR <br />2, THE CONTRACTOR WILL BE RESPONSIBLE FOR AND SHALL PAY FOR ALL CONSTRUCTION <br />STAKING I LAYOUT. <br />PERIMETER INDICATE PROPOSED GRADES OUTSIDE THE BUILDING. SPOT ELEVATIONS WITH <br />LABELS INSIDE THE BUILDING PERIMETER INDICATE PROPOSED FINISH FLOOR ELEVATIONS. <br />_---= EXISTING SPOT ELEVATION <br />3. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL RELATED CONSTRUCTION PERMITS, <br />19. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DETERMINING QUANTITIES OF CUT, <br />\�� 905-'- PROPOSED CONTOUR <br />INCLUDING THE NPDES PERMIT FROM THE MPCA. SUBMIT A COPY OF ALL PERMITS TO THE <br />CITY. <br />FILL AND WASTE MATERIALS TO BE HANDLED, AND FOR AMOUNT OF GRADING TO BE DONE IN <br />ORDER TO COMPLETELY PERFORM ALL WORK INDICATED ON THE DRAWINGS. IMPORT <br />"OLS PROPOSED SPOT ELEVATION <br />SUITABLE MATERIAL AND EXPORT UNSUITABLE I EXCESS I WASTE MATERIAL AS REQUIRED. <br />ME= MATCH EXISTING <br />4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL SIGNAGE (CONSTRUCTION <br />ZONES) NECESSARY TO CONSTRUCT PROPOSED IMPROVEMENTS, ALL SIGNAGE LAYOUTS <br />ALL COSTS ASSOCIATED WITH IMPORTING AND EXPORTING MATERIALS SHALL BE INCIDENTAL <br />TO THE CONTRACT. <br />- - - - - - - PROPOSED GRADING LIMITS <br />MUST BE DESIGNED BY THE CONTRACTOR AND APPROVED BY LOCAL AUTHORITIES. <br />19. NO FINISHED SLOPES SHALL EXCEED 4' HORIZONTAL TO 1' VERTICAL (4:1 ), UNLESS <br />_ <br />PROPOSED SAND SUBBASE AT FROST FOOTED STOOPS <br />S. INSTALL CONTROL FENCING AND BARRICADING AS NECESSARY TO PROTECT THE PUBLIC. <br />OTHERWISE NOTED. <br />' <br />O PROPOSED MANHOLE (MH) <br />S. INSPECT SITE AND REVIEW SOIL BORINGS TO DETERMINE EXTENT OF WORK AND NATURE OF <br />20. ALL DISTURBED AREAS OUTSIDE THE BUILDING PAD WHICH ARE NOT DESIGNATED TO BE <br />905.1 OR 905. <br />MATERIALS TO BE HANDLED. <br />PAVED SHALL RECEIVE AT LEAST 6" OF TOPSOIL AND SHALL BE SODDED. <br />• PROPOSED CATCH BASIN (CB) <br />7. REFER TO SPECIFICATIONS FOR DEWATERING REQUIREMENTS. <br />21. WHERE NEW SOD MEETS EXISTING SOD, EXISTING SOD EDGE SHALL BE CUT TO ALLOW FOR A <br />4 PROPOSED FLARED END SECTION (FES) <br />8. CHECKALL PLAN AND DETAIL DIMENSIONS AND VERIFY SAME BEFORE FIELD LAYOUT. <br />CONSISTENT, UNIFORM STRAIGHT EDGE. JAGGED OR UNEVEN EDGES WILL NOT BE <br />ACCEPTABLE, REMOVE TOPSOIL AT JOINT BETWEEN EXISTING AND NEW AS REQUIRED TO <br />f„- j PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS <br />9. REFER TO ARCHITECTURAL PLANS FOR BUILDING AND STOOP DIMENSIONS AND LAYOUT. <br />ALLOW NEW SOD SURFACE TO BE FLUSH WITH EXISTING. <br />---- -- - _---- PROPERTY UNE <br />22. FAILURE OF TURF DEVELOPMENT: IN THE EVENT THE CONTRACTOR FAILS TO PROVIDE AN <br />10. REFER TO THE STORM WATER POLLUTION PREVENTION PLAN(SWPPP) NARRATIVE, PART OF <br />ACCEPTABLE TURF, THE CONTRACTOR SHALL RESOD ALL APPLICABLE AREAS, AT NO <br />SECTION 01819FOR EROSION CONTROL REQUIREMENTS. SECTION 3100 00 SHALL BE <br />ADDITIONAL COST TO THE OWNER TO THE SATISFACTION OF THE ENGINEER. <br />RESPONSIBLE FOR FULL IMPLEMENTATION OF THE S WPPP. <br />23. ANY MANHOLE, CATCH BASIN, STORM SEWER, SANITARY SEWER DRAINTILE OR OTHER <br />11. MAINTAIN ADJACENT PROPERTY AND PUBLIC STREETS CLEAN FROM CONSTRUCTION CAUSED <br />POTENTIAL SOURCE FOR CONTAMINATION SHALL BE INSTALLED AT LEAST 10 FEET <br />DIRT AND DEBRIS ON A DAILY BASIS. PROTECT DRAINAGE SYSTEMS FROM SEDIMENTATION <br />HORIZONTALLY FROM ANY WATERMAIN PER MINNESOTA PLUMBING CODE. THIS ISOLATION <br />EDGEWOOD <br />MIDDLE SCHOOL <br />2018 ADDITION AND <br />RENOVATION <br />5100 EDGEWOOD DR. <br />MOUNDS VIEW, MN 55112 <br />ISD #621: MOUNDS <br />VIEW PUBLIC SCHOOLS <br />4570 VICTORIA ST N <br />SHOREVIEW, MN 55116 <br />tAl <br />AA'PfIaOY-JO1INSOA' <br />AS A RESULT OF CONSTRUCTION RELATED DIRT AND DEBRIS. <br />DISTANCE SHALL BE MEASURED FROM THE OUTER EDGE OF THE PIPE TO THE OUTER EDGE OF <br />THE CONTAMINATION SOURCE (OUTER EDGE OF STRUCTURES OR PIPING OR SIMILAR). <br />BENCHMARKS (FIELD VERIFY BEFORE USING) <br />12MAINTAIN DUST CONTROL DURING GRADING OPERATIONS. <br />. <br />1.) Top of top nut of tiro hydrant on West side of Ed9awood Ave -between 5101 and 5139 <br />GRADING AND <br />13. ALL EROSION CONTROL METHODS SHALL COMPLY WITH MPCA AND LOCAL REGULATIONS. <br />24. LOCATE ALL EXISTING UTILITIES, VERIFY LOCATION, SIZE AND INVERT ELEVATION OF ALL <br />EXISTING UTILITIES. VERIFY LOCATIONS, SIZES AND ELEVATIONS OF SAME BEFORE <br />Elavalion-911.87feet <br />DRAINAGE <br />14. CONTRACTOR SHALL MINIMIZE DISTURBANCE TO SITE AND PROTECT EXISTING SITE FEATURES <br />BEGINNING CONSTRUCTION. <br />2.) Top of lop nut of fire hydrant on West side of Edgewood Ave - between $061 and 5DTI <br />Elevation =901.47 feet <br />PLAN <br />(INCLUDING TURF AND VEGETATION) WHICH ARE TO REMAIN. <br />25. CONTRACTOR SHALL MAINTAIN DRAINAGE FROM EXISTING BUILDING AT ALL TIMES. PROVIDE <br />15. PROPOSED CONTOURS AND SPOT ELEVATIONS ARE SHOWN TO FINISH GRADE UNLESS <br />TEMPORARY STORM SEWER (INCLUDING, SLIT NOT LIMITED TO, CATCH BASINS, MANHOLES, <br />PIPING, ETC.) AS REQUIRED. EXISTING STORM SEWER SHALL NOT BE REMOVED UNTIL <br />3J Top of MN DOT control point 9043 <br />Elevation - 880.69 feet <br />OTHERWISE NOTED. <br />TEMPORARY OR PERMANENT STORM SEWER IS INSTALLED AND FUNCTIONAL. COORDINATE <br />16. PROPOSED ELEVATIONS SHOWN TYPICALLY AS 05.1 OR 05 SHALL BE UNDERSTOOD TO MEAN <br />ALL REMOVALS WITH APPROPRIATE TRADES (SITE UTILITY CONTRACTOR, MECHANICAL <br />CONTRACTOR ETC.) AS REQUIRED. <br />905.1 OR 905. <br />26. ALL WORK RELATED TO OR AFFECTING MUNICIPAL INFRASTRUCTURE (STREETS, UTILITIES, <br />ETC,) REQUIRES A MINIMUM OF 24 4OUR NOTICE TO PUBLIC WORKS AT 763.717.4050. <br />Scale: I"= 4V 0 20 40 <br />CITY SUBMITTAL C1,31 <br />NOT FOR CONSTRUCTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.