Laserfiche WebLink
Mounds View City Council <br />Regular Meeting <br />July 8, 2019 <br />Page 5 <br />t <br />2 Ayes — 5 Nays — 0 Motion carried. <br />3 <br />4 F. Resolution 9134, Authorize Stormwater Pipe Repairs at 8240 Sunnyside <br />5 Road. <br />6 <br />7 Public Works Director Peterson requested the Council authorize stormwater pipe repairs at 8240 <br />8 Sunnyside Road. He explained in June staff was notified of a problem with the pipe in this area <br />9 and noted two sections were found to be sinking and in need of replacement. He reported two <br />10 contractors were contacted and bids were received. Staff recommended the project proceed with <br />11 the low bidder, which was submitted by Dave Perkins Contracting. <br />12 <br />13 Council Member Meehlhause asked if the street would have to be torn up. Public Works <br />14 Director Peterson stated he hoped the street would not have to be torn up, only the curbing and <br />15 boulevard area. <br />16 <br />17 Mayor Mueller requested staff post photos of the sinking site on the City's website to inform <br />18 residents on what had occurred. <br />19 <br />20 MOTION/SECOND: Hull/Bergeron. To Waive the Reading and Adopt Resolution 9134, <br />21 Authorize Stormwater Pipe Repairs at 8240 Sunnyside Road. <br />22 <br />23 Ayes — 5 Nays — 0 Motion carried. <br />24 <br />25 G. Resolution 9135, Authorizing the Consulting Services for the Design and <br />26 Construction for the 2020 Street Improvement Project. <br />27 <br />28 Public Works Director Peterson requested the Council authorize the consulting services for the <br />29 design and construction for the 2020 Street Improvement Project. He reviewed the streets <br />30 included in this project and noted Stantec would be assisting the City with consulting services. <br />31 The costs for the project were reviewed and staff recommended authorization for the consulting <br />32 services. <br />33 <br />34 Council Member Meehlhause questioned how the gap in expenses would be covered. Public <br />35 Works Director Peterson reported the balance for the engineering services would be paid out in <br />36 2020. <br />37 <br />38 Mayor Mueller questioned why staff had only received a quote from Stantec. Public Works <br />39 Director Peterson reported Stantec really knows the City's streets and infrastructure systems. He <br />40 commented this resulted in costs being kept to a minimum for engineering fees. <br />41 <br />42 MOTION/SECOND: Meehlhause/Gunn. To Waive the Reading and Adopt Resolution 9135, <br />43 Authorizing the Consulting Services for the Design and Construction for the 2020 Street <br />44 Improvement Project. <br />45 <br />