Laserfiche WebLink
Mounds View City Council July 8, 2019 <br />Regular Meeting Page 5 <br />Ayes – 5 Nays – 0 Motion carried. <br />F. Resolution 9134, Authorize Stormwater Pipe Repairs at 8240 Sunnyside <br />Road. <br />Public Works Director Peterson requested the Council authorize stormwater pipe repairs at 8240 <br />Sunnyside Road. He explained in June staff was notified of a problem with the pipe in this area <br />and noted two sections were found to be sinking and in need of replacement. He reported two <br />contractors were contacted and bids were received. Staff recommended the project proceed with <br />the low bidder, which was submitted by Dave Perkins Contracting. <br />Council Member Meehlhause asked if the street would have to be torn up. Public Works <br />Director Peterson stated he hoped the street would not have to be torn up, only the curbing and <br />boulevard area. <br />Mayor Mueller requested staff post photos of the sinking site on the City’s website to inform <br />residents on what had occurred. <br />MOTION/SECOND: Hull/Bergeron. To Waive the Reading and Adopt Resolution 9134, <br />Authorize Stormwater Pipe Repairs at 8240 Sunnyside Road. <br />Ayes – 5 Nays – 0 Motion carried. <br />G. Resolution 9135, Authorizing the Consulting Services for the Design and <br />Construction for the 2020 Street Improvement Project. <br />Public Works Director Peterson requested the Council authorize the consulting services for the <br />design and construction for the 2020 Street Improvement Project. He reviewed the streets <br />included in this project and noted Stantec would be assisting the City with consulting services. <br />The costs for the project were reviewed and staff recommended authorization for the consulting <br />services. <br />Council Member Meehlhause questioned how the gap in expenses would be covered. Public <br />Works Director Peterson reported the balance for the engineering services would be paid out in <br />2020. <br />Mayor Mueller questioned why staff had only received a quote from Stantec. Public Works <br />Director Peterson reported Stantec really knows the City’s streets and infrastructure systems. He <br />commented this resulted in costs being kept to a minimum for engineering fees. <br />MOTION/SECOND: Meehlhause/Gunn. To Waive the Reading and Adopt Resolution 9135, <br />Authorizing the Consulting Services for the Design and Construction for the 2020 Street <br />Improvement Project.