My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 2019/07/08
MoundsView
>
Commissions
>
City Council
>
Minutes
>
2010-2019
>
2019
>
Minutes - 2019/07/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 9:24:38 AM
Creation date
7/24/2019 1:03:11 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
7/8/2019
Supplemental fields
City Council Document Type
City Council Minutes
Date
7/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council July 8, 2019 <br />Regular Meeting Page 5 <br />Ayes – 5 Nays – 0 Motion carried. <br />F. Resolution 9134, Authorize Stormwater Pipe Repairs at 8240 Sunnyside <br />Road. <br />Public Works Director Peterson requested the Council authorize stormwater pipe repairs at 8240 <br />Sunnyside Road. He explained in June staff was notified of a problem with the pipe in this area <br />and noted two sections were found to be sinking and in need of replacement. He reported two <br />contractors were contacted and bids were received. Staff recommended the project proceed with <br />the low bidder, which was submitted by Dave Perkins Contracting. <br />Council Member Meehlhause asked if the street would have to be torn up. Public Works <br />Director Peterson stated he hoped the street would not have to be torn up, only the curbing and <br />boulevard area. <br />Mayor Mueller requested staff post photos of the sinking site on the City’s website to inform <br />residents on what had occurred. <br />MOTION/SECOND: Hull/Bergeron. To Waive the Reading and Adopt Resolution 9134, <br />Authorize Stormwater Pipe Repairs at 8240 Sunnyside Road. <br />Ayes – 5 Nays – 0 Motion carried. <br />G. Resolution 9135, Authorizing the Consulting Services for the Design and <br />Construction for the 2020 Street Improvement Project. <br />Public Works Director Peterson requested the Council authorize the consulting services for the <br />design and construction for the 2020 Street Improvement Project. He reviewed the streets <br />included in this project and noted Stantec would be assisting the City with consulting services. <br />The costs for the project were reviewed and staff recommended authorization for the consulting <br />services. <br />Council Member Meehlhause questioned how the gap in expenses would be covered. Public <br />Works Director Peterson reported the balance for the engineering services would be paid out in <br />2020. <br />Mayor Mueller questioned why staff had only received a quote from Stantec. Public Works <br />Director Peterson reported Stantec really knows the City’s streets and infrastructure systems. He <br />commented this resulted in costs being kept to a minimum for engineering fees. <br />MOTION/SECOND: Meehlhause/Gunn. To Waive the Reading and Adopt Resolution 9135, <br />Authorizing the Consulting Services for the Design and Construction for the 2020 Street <br />Improvement Project.
The URL can be used to link to this page
Your browser does not support the video tag.