My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2019/08/05
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2019
>
Agenda Packets - 2019/08/05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:17 PM
Creation date
9/17/2019 12:01:56 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/5/2019
Supplemental fields
City Council Document Type
City Council Packets
Date
8/5/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />Benchmarks: Yellow currently occurring <br />Drinking Water <br />1. On a per capita basis, average yearly consumption declines <br />2. Positive test results (safe to drink) on regularly scheduled/required tests. <br />3. Reduction on the Inflow side of INI metering levels <br />4. Replacements of all water meters— 2% complete <br />Storm Water <br />1. 100% of all Sump pumps discharging into storm water system <br />2. Rain gardens maintained and working as designed <br />3. Storm Water retention ponds maintained and working as designed <br />4. Storm Water drainage components maintained and working as designed <br />Sanitary Sewer <br />1. Slip lining of a municipal lines — 47% completed <br />2. Slip lining of manhole structures — 2% done <br />3. Slip lining of all lateral lines — 0% complete <br />4. Sanitary Sewer components maintained and working as designed. <br />5. Reduction on the Infiltration side of INI metering levels <br />6. Large private systems outflow metering - Existing <br />Action Steps/Items needed: <br />1. Build web page <br />2. Steal or design infographics <br />3. Produce video about program <br />4. Adopt Ordinance on Point of Sale and amend fee schedule <br />5. Increase water rates fee <br />6. Produced education materials <br />7. Post/Hire new PW employee <br />8. Develop plan for water meter replacement (starting with commercial) <br />9. Develop contractor lists for scoping and repairing Lateral Sewer Lines <br />10. Develop, Issue and Award RFP for Scoping and repairing Lateral Sewer Lines <br />11. Research and apply for applicable grants to implement now or in the future <br />
The URL can be used to link to this page
Your browser does not support the video tag.