My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 9174
MoundsView
>
City Council
>
City Council
>
Resolutions
>
09000 - 09499 (2018-2021)
>
Resolution 9174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2019 12:28:18 PM
Creation date
10/15/2019 12:26:43 PM
Metadata
Fields
Template:
MV City Council
City Council Document Type
Resolutions
Date
10/14/2019
Resolution/Ordinance Number
974
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 9174 <br />CITY OF MOUNDS VIEW <br />COUNTY OF RAMSEY <br />STATE OF MINNESOTA <br />APPROVING THE PROPOSAL FROM ADVANCE ENGINEERING AND <br />ENVIRONMENTAL SERVICES, INC. (AE2S) FOR WATER TREATMENT <br />BACKWASH STUDY AND COMPLIANCE ISSUE <br />WHEREAS, the Public Works Department has many responsibilities including <br />efficiently operating the water distribution system. The system includes (6) wells, an <br />elevated water tower, a ground reservoir, a booster station and (3) water treatment <br />plants; and <br />WHEREAS, the water treatment systems have been in operation for over 45 <br />years with no major upgrades or repairs to the system; and <br />WHEREAS, The City Council approved a water production study be completed <br />and a management program be prepared by AE2S. After the study was completed the <br />results along with a time line for upgrades and improvements to the plants were presented <br />at the October, 3, 2016 Work Session; and <br />WHEREAS, At the March 25th, 2019 City Council Meeting the Council approved <br />AE2S to perform the water study and proceed with design and bidding phases of the <br />rehabilitation of WTP No. 1, WTP No. 2, WTP No. 3, and the Booster Station; and <br />WHEREAS, AE2S has the plans and specifications at the 95% milestone of the <br />final design phase, and the City Council discussed the Project at the October 7, 2019 <br />Work Session; and <br />WHEREAS, During the water study and testing at Water Treatment Plant No. 1, <br />the Minnesota Department of Health (MDH) brought to the attention of AE2S and Mounds <br />View Public Works Staff, that WTP No. 1 had combined radium results above the <br />regulated maximum contaminant level (MCL); and <br />WHEREAS, AE2S has provided a proposal for completing a pilot study at Water <br />Treatment Plant No. 1 (WTP1) for a proposed cost for the study of $38,900.00. <br />NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Mounds <br />View, Ramsey County, Minnesota as follows: <br />1. Authorizes Advanced Engineering and Environmental Services, Inc. (AE2S) to <br />complete the plans and specifications for the Water Treatment Plant rehabilitation <br />project for Plants #2 and #3 and the booster station. <br />The Mounds View Vision <br />4 7hrir iri- Lr.wrahle Cnirtmimi.iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.