Laserfiche WebLink
Curb Stop — Valve Cover I City cost plus 10% administrative fee <br />Municipal Sanitary Sewer System Fees Chapter <br />907 <br />Lateral Sewer Line Inspection <br />$250 per lateral line <br />$2,485 per Metropolitan Council Environmental <br />Services <br />Sewer Service Availability Charge (SAC) <br />Sewer Usage Rate <br />Sewer Usage Rate <br />Per Quarter <br />$2.-94 $3.02-per 1,000 gallons water sold per quarter <br />Sewer Service Charge, Residential <br />$360 $37.96 per residential equivalent unit (REU) <br />connection per quarter <br />Sewer Service Charge, Commercial/Industrial/ <br />Public Buildings and Churches <br />$89.66 $93.24 per REU Connection per quarter <br />$100 plus surcharge <br />Sewer Connection/Repair/Disconnect.(Rmght-Of- <br />Way Permit Needed if CV/'.ayatlen OGG irs in P blip <br />Rights Of Way) <br />Sewer Unit Charge New Connection Only) <br />$150 per connection <br />Semler Insnentlen <br />NO nharge if during normal business hours, otherwise <br />Sewer Re-inspection or re-inspection after hours. <br />One-ho" Call-out rate per visit *Minimum 2 Hours <br />Surface Water Management SWM Utility Fees <br />Chapter 908 <br />SWM New Construction, R-1 <br />$212 per lot <br />SWM New Construction, R-2 <br />$1,038 per acre <br />SWM New Construction, R-3, R-4, R-O <br />$1,500 per acre <br />SWM New Construction, B-1, B-2, B-3, B-4 <br />$1,500 per acre <br />SWM New Construction, 1-1, PUD <br />$2,096 per acre <br />SWM Utility Rate Charge, R-1 Single Family and R- <br />2 Single and Two Family Residential <br />$42.00 $13.00 per unit per quarter <br />SWM Utility Rate Charge, R-3 Medium Density <br />Residential <br />$66.61 $71.08 per acre per quarter <br />SWM Utility Rate Charge ,R-4 High Density <br />Residential, R-5 Mobile Homes and R-O Residential <br />Office <br />$77.81- $84.29 per acre per quarter <br />SWM Utility Rate Charge ,B-1 Neighborhood <br />Business, B-2 Limited Business, B-3 Highway <br />Business and B-4 Regional Business <br />$101.92 $110.41 per acre per quarter <br />SWM Utility Rate Charge, 1-1 Industrial <br />$797 $86.20 per acre per quarter <br />SWM Utility Rate Charge, PUD Planned Unit <br />Development <br />$90.24 $97.76 per acre per quarter <br />SWM Utility Rate Charge, CRP Conservancy, <br />Recreation and Preservation <br />$41.08 $12.00 per acre per quarter <br />SWM Utility Rate Charge, School or Church, Public <br />or Private <br />$36.62 $39.67 per acre per quarter <br />Illicit Discharge Fee To be determined by the Public Works Director on <br />a case by case scenario. <br />Street Lighting Utility Fees Chapter 904 <br />Residential (single family homes, duplexes, $4.50 per unit per quarter <br />four Iexes, condominium and townhomes <br />Commercial/Industrial $21.09 per acre per quarter <br />Institutional/Charitable $21.09 per acre per quarter <br />Apartments $21.09 per acre per quarter <br />Construction Site and Land Disturbance Fees (Ordinance 804, Chapter 1303) Additional Fees <br />May be Required for Legal and Engineering Costs Incurred by the City. <br />50 Cubic Yards or Less $25 <br />51 to 100 Cubic Yards $50 <br />101 to 1,000 Cubic Yards $50 base fee plus $20 for each 100 cubic yards or <br />fraction thereof <br />2020 (Draft) Mounds View Fee Schedule Page 12 of 13 <br />