My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 804
MoundsView
>
Commissions
>
City Council
>
Ordinances
>
2000-2009
>
2008
>
Ordinance 804
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 11:05:43 AM
Creation date
11/12/2008 9:29:07 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Ordinances
MEETINGDATE
11/10/2008
Commission Doc Number (Ord & Res)
804
Supplemental fields
City Council Document Type
Ordinances
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ordinance 804 <br />Page 12 <br />b. Erosion and sediment control. Temporary and permanent erosion and <br />sediment control measures shall be installed on all sites as necessary <br />to prevent erosion and sedimentation from impacting any adjacent <br />property, rights-of-way, drainage system, lake, pond, wetland, <br />watercourse, natural resource or other protected area. <br />c. Implementation of land disturbance plan. All erosion and sediment <br />control measures must be operational prior to the start of any land <br />disturbance activity as specified in the storm water pollution prevention <br />plan, construction plans and specifications, the City of Mounds View <br />land disturbance plan and Implementation Requirements, or as <br />deemed necessary by the City based on actual site conditions. <br />d. Inspection. Inspection of the land disturbance plan measures will be <br />carried out as required by the City approved land disturbance permit <br />conditions of approval and the City of Mounds View land disturbance <br />plan and Implementation Requirements. <br />e. Maintenance. All erosion and sediment control measures must be <br />maintained throughout the duration of the project. Deficiencies found <br />through inspection of a site shall be repaired as necessary to bring the <br />site into conformance with this Chapter, the plans and specifications, <br />the City of Mounds View land disturbance plan and Implementation <br />Requirements and as set forth in the land disturbance permit <br />conditions of approval. At minimum, land disturbance plan items shall <br />be maintained as follows: <br />(1) If a perimeter erosion control device is found to have sediment <br />accumulation in excess of one third of the total device height, the <br />sediment shall be removed within twenty four (24) hours of discovery. <br />(2) If an erosion control device is found to be nonfunctional, it shall <br />be repaired or replaced within twenty four (24) hours of discovery. <br />(3) Temporary sediment basins shall be maintained when sediment <br />reaches one half the outlet height or one half the storage volume within <br />seventy two (72) hours after discovery. <br />(4) Additional erosion and sediment control measures shall be <br />installed as directed by the City as found necessary to protect life and <br />limb, the environment, properties or the stability of a property until final <br />stabilization, has been achieved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.