Public Works Staff Report <br />• Scheduling meeting with RCWD for ARJD#1 project. <br />Hillview Park: <br />• City Council approved the proposal to expand the hockey rink, work will stars later this <br />summer/early fall. <br />• Staff removed the West end hockey boards and asphalt surface in preparation of the rink <br />expansion. <br />• Contractor started the expansion of the rink new posts have been installed and chain link <br />fence on the top. <br />• Hockey rink fence completed, Public Works staff completed installing the boards. Grading <br />and fill need to be completed. Depending on the weather the base may be a 2018 project. <br />Other: <br />MCES Sewer Interceptor Project: Metropolitan Council Environmental Services is planning to <br />improve a large diameter sewer pipe at the northwest corner of Quincy and Hillview. MCES is <br />finalizing construction plans and have been reviewed by engineering division, comments returned <br />to MCES. MCES still planning on a 2015 project. Some trees have been tagged in order to be <br />transplanted in other City Parks. Project still scheduled to start later this spring. The work on the <br />meter station at the intersection of Quincy and Hillview has been delayed due to heavy rains and <br />flooding in September. Contractor is having to clean out the interceptor again due to heavy <br />sediment deposits in the line. Work will continue through the winter. A December closure of <br />Quincy Street to the north of Hillview is anticipated and is be required to complete Project is <br />nearly completed. Staff met with MCES to coordinate the installation of trail and planting of trees <br />as part of the restoration. A cooperative layout and tree location is being coordinated between <br />Mounds View and MCES. Working with MCES for final restoration of the southeast corner of the <br />park. This project has been completed and restoration of the area is almost finished, trees are <br />planted, hydro seeding done. City contractor continues to restore the area used for street project. <br />City contractor has restore areas used for bone yard. <br />MCES <br />will potentially need to gain access <br />to the <br />site again, they <br />are <br />having some issues with a <br />flume <br />that was installed. At this time the <br />extent <br />of work is yet to <br />be <br />determined. <br />5/5 <br />