Laserfiche WebLink
Larson Engineering, Inc. <br />3524 Labore Road <br />White Bear Lake, MN 55110-5126 <br />651.481.9120 Fax: 651.481.9201 <br />www.larsonengr.com <br />AIM <br />Project: <br />Reported to: <br />DAILY INSPECTION REPORT <br />City of Mounds View <br />Tennis Court Reconstruction <br />Greenfield Park <br />Fred Kolkmann, CTCB <br />Tennis & Sport Surfaces, LLC <br />1921 Mayfair Road, Grafton, WI 53024 <br />PROJECT PROGRESS: <br />Weather: Sunny <br />Date: 7-16-2018 <br />File No. 12186060 <br />Contractor: <br />Bituminous Roadways, Inc. <br />Time: 12:00pm to 1:30pm <br />Temp: 85' F <br />1. Bituminous Roadway paving the wear coarse lift at Greenfield Park. <br />2. Two (2) large areas required leveling prior to placing the final wear course lift. <br />3. Paving pattern was one pass in the east to west direction at the south end, then 5 passes in <br />the north to south direction starting from the west end and moving east, with the last 2 <br />passes at the north end in the east to west direction. <br />4. Overall size of the paved area was correct. <br />5. Will need backfill along the perimeter of the court pavement and restoration after fences are <br />installed. <br />Larson Engineering, Inc. <br />Greg Buchal <br />Project Manager <br />See 6 photographs from 7-16-2018 <br />