My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-2009 Minutes
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Minutes
>
2000-2009
>
2009
>
05-28-2009 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 3:04:47 PM
Creation date
4/1/2020 6:01:38 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
*Having water for the band: Use our sponsorship donations would be used to purchase water for <br /> the band. <br /> *Televising issues: VanAlstine determined where CTV truck, trailer and scaffolding will be <br /> located in order to televise. <br /> *Band uses PA system to announce the upcoming song, not amplifying the music. VanAlstine will <br /> be in contact with band director about connecting CTV with the PA system. <br /> *VanAlstine will contact band representative about seating arrangement and perhaps having a rep in <br /> the CTV van to help with performance video. <br /> *In case of cancellation, band representation should contact Pat Prindle who will then notify Van <br /> Alstine and City Hall to post on electronic board. <br /> <br /> b. Ball field improvements. <br /> <br /> *Groveland ball field needs overhaul according to PIP. Replace backstop with overhang backstop, fill in <br /> low spots of outfield, adjust infield size and shape with 60’ base path with base pegs. Install irrigation <br /> for field and around building. Suggestion to overlap new backstop with existing bench fencing by <br /> bringing in backstop and extending a few feet to create overlap. Direct Staff to provide a plan and <br /> schedule of work before installation. <br /> <br /> Silver View fencing needs fencing between backstops and bench fencing at both fields. Entrance should be <br /> at backstop. Direct staff to investigate feasibility of adding height to the 6-foot bench fence to reach <br /> 8-10 feet, or just put in an 8-foot fencing from bench fence toward backstop. Determine what is <br /> safest for players. <br /> Bases and pitching pad at Silver View: In April, directed Staff to order 6 movable pegs. Dazenski and <br /> Arel to set distances. Remove front pitching rubbers at all fields. Staff to determine storage of items. This <br /> will be done next week along with the installation of a new Jox Box on S.V. #1. The base pegs and Jox Box <br /> have been received. <br /> <br /> Lambert Park: Direct Staff investigate best fencing options between backstop and bench, which will <br /> also allow for pleasure rink ice flooding. <br /> <br /> c. Eagle Scout recognition: Set date to honor Eagle Scouts that helped with parks. There are five and <br /> should have two more and they may be able to make the June meeting. Dazenski will arrange to have <br /> plaques made for June presentation. <br /> <br /> d. Farmer’s Market: Would the Commission support the development of a committee to include a PRF <br /> Commissioner, EDC Commissioner, and interested residents to explore the possibility of a Farmer’s <br /> Market in Mounds View in 2010? Although supportive of the idea, the Commission does not see a <br /> Farmer’s Market under the realm of the Park, Recreation, and Forestry Commission unless a park is <br /> directly involved with the location. <br /> <br />7. New Business: <br /> a. Park Tour conducted prior to meeting. <br /> Parks included: Silver View, Lambert, Oakwood, Groveland, and a Hillview drive-by. <br /> The Commission toured Silver View, Lambert, Oakwood and Groveland. Parks look good and were <br /> all being well used. Ball field improvements. <br /> Discussed Lambert Building and possible location of a new building. <br /> Discussed development of a document that lists major park upgrades. Items to include might be <br /> playground replacement, trail or ball field upgrades, larger building repairs. DeBar has this as a <br /> goal to document quarterly. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.