Laserfiche WebLink
Category Year Park Item Details Cost Budget - <br />Maintenance/Park <br />Dedication/Other <br />Done?Notes <br />B 2007 Oakwood Fence <br />Construct a fence along Hillview and <br />Quincy 10,000.00$ Park Dedication Done <br />Oakwood Park Rehabilitation <br />Project ($50,000 budgeted in 2006, <br />$60,000 Budgeted in 2007) $9,000 <br />fence/ $1,000 Concrete ribbon <br />under fence -do in house <br />B 2008 Oakwood <br />Picnic Tables/Benches/ <br />Trash Receptacles <br />Add picnic tables (2), Benches (4), <br />Trash Receptacles (4) 7,000.00$ Park Dedication Done <br />C 2008 Oakwood Disc Golf Course <br />Add disc golf fields to north side <br />of the park to Greenfield $55,000 Park Dedication Dropped <br />This may be eliminated. Wait until <br />after the neighborhood scheduled <br />for January 24, 2008. DRAFT CIP <br />has $40,000 budget for 2009 to do <br />something in this area (if <br />Commission recommends) <br />B 2007 Oakwood Play set <br />Remove former playset swings, <br />border, and sand $500 General Park Fund Done <br />C 2008 <br />Oakwood, <br />Woodcrest, <br />Greenfield, Silver <br />View Park Trailway Paving Project <br />Pave trails at Oakwood, Woodcrest, <br />Greenfield, Silver View 30,000.00$ Park Dedication <br />B 2007 Random Border Replace border on playground 4,300.00$ Park Dedication Done Needs Fibre Fill approved 2005 PIP include with <br />B 2007 Random Picnic Tables (2) <br />Add two picnic tables next to the <br />building 2,200.00$ Park Dedication Done <br />$900 for each table / $200 for <br />concrete <br />B 2007 Random Baseketball Court Create a 25'X25' baseketballcourt 2,200.00$ Park Dedication Done <br />City to level andn gravel site, <br />contractor ro pave - $1,100, City to <br />purchase and install standard <br />B 2008 Silver View Pond Aerator <br />Aerator installed in Silver view pond - <br />Running electrical to aerator <br />represents the majority of the costs 5,000.00$ General Park Fund <br />Use areator system from golf <br />course. Test using generator in <br />2007 <br />B 2008 Silver View Ball Field <br />Redo Silver View Ball Field #1 and <br />warning track 2,000.00$ Park Dedication <br />B 2010 Silver View Lake <br />Develop a proposal to treat the algae <br />a) do nothing; b)barle straw <br />treatment; c) bacterial treatment;2,000.00$ General Park Fund Review issue in 2007 <br />C 2009 Silver View Lake Removed sediment 20,000.00$ Storm water Utility Fund <br />$7-$9 per cubic yard if excess sediment <br />is placed in the city. $12-13/cu.yd. if the <br />material needs to be moved off site. <br />Volume has yet to be calculated. Est. <br />2,000cu.yd.@$10 per <br />B 2009 Silver View Trail Repair/seal coat 7,200.00$ General Park Fund Working with street dept. <br />C 2008 Silver View Parking Lot Seal Coat 17,000.00$ Park Dedication Done <br />C 2009 Sysco Outlot A Parking Lot and Trailway <br />Construct a small parking lot and <br />bituminous trailway on the Sysco <br />Outlot A property - City is committed <br />to spend up to $150,000. Remainder <br />would be Medtronic's cost $378,000 Park Dedication N/A <br />City to pay $150,000, Remainder <br />from Medtronic. Most of area <br />appears to be wetland - need <br />remediation plan first.