Laserfiche WebLink
M E M O R A N D U M <br />TO: PARKS AND RECREATION AND FORESTRY COMMISSIONERS <br />FROM: STEVE DAZENSKI | PARKS SUPERVISOR <br />DATE: DECEMBER 14, 2011 <br />RE: REPORT ON LAMBERT BUILDING PROGRESS, PARKS AND SKATING RINKS <br />The Lambert building is finally showing signs of progress. There were some change orders, waits <br />for the various permits, (specifically plumbing) and some decisions that needed to be made <br />regarding materials. The weather has certainly been in the contractors favor for the time of the year. <br />The Building is up, electric and plumbing has been roughed in, windows and doors have been hung <br />and the roof has shingles. The excavators were there this morning doing inside soil corrections, <br />adding sand for the base and leveling it out. The floor will be poured very soon. <br />All the parks have been gone thru prepping them for the winter that has yet to arrive. We did start <br />establishing ice but we will hold off for a while till the weather turns. We did get a base going and <br />some saturation however what ice we did have has melted. I have given a heads up to the YMCA <br />that we may not be making our projected December 19th opening now it is definite! However as <br />soon as it gets cold enough we will strive to get the rinks running ASAP. <br />We were hit with “permanent marker graffiti” at Groveland last week, the building, playground <br />equipment and even the electrical box’s. The police were notified and they took pictures and wrote <br />a report. I have not heard anything from them as far as an arrest. <br />We will be talking to the residents alongside Hillview Park concerning the proposed hockey rink, <br />lighting and plantings. Our Forrester is putting together a plan for a “green” light and sound buffer. <br />Equipment has been worked on and will continue to be during the winter months. <br />ITEM NO. 9B