Laserfiche WebLink
Trailway System Plan - DRAFT <br />11 <br /> <br /> <br /> <br /> <br />Fill the Gaps Priorities <br />Short Term: <br />• Complete CR H walkway (sidewalk) between Edgewood Drive and Silver Lake Road. Coordinate with area street construction project in area. <br />Medium Term: <br />• Complete CR 10 trailways (North and South sides) <br />• Complete Long Lake Rd trailway at north end (North County Line) to CR J/ 85th Ave <br />• Continuation of existing walkways along main E/W and N/S routes. <br /> <br />Must define purpose of striped lanes or acceptable uses, and if bike use of sidewalks is acceptable.