Laserfiche WebLink
Trailway System Plan - DRAFT 8 North/South Routes Bike- way Walk- way Connecting Landmarks and Regional Trailways Status – Gaps - Plans Groveland Road Yes No • Connects with Groveland Park • Connection with Blaine trailway along CR J/ 85th Ave Striped lanes 4-8’, both sides, from CR 10 to CR J/ 85th Ave. MSA route north of CR 10 Gap: No striped lanes from Bronson to CR10 Plan: Future implementation extension of trailway with Knollwood Dr with local street project and extension with Knollwood Drive. Silver Lake Road – Red Oak Drive Yes ? Yes • Full North/South route: Connects Silver View and Woodcrest Parks • Connection with Rice Creek trailway with Long Lake Park and the Mississippi River trailway as destinations • Connection with Blaine trailway along CR J/ 85th Ave Concrete sidewalk, on east side, from CR H, through CR 10, continuing on Red Oak Dr to Hillview Rd. MSA route north of CR 10 (Red Oak Dr) Gap: No controlled walk/bike features from Hillview Rd to Long Lake Rd coinciding with bump outs Plan: Mark trailway on west side Long Lake Road Yes Yes • Full North/South route: Connects Random and Arden Parks and Irondale HS. Connection with Rice Creek, Blaine and New Brighton trailways, and with Long Lake Park and the Mississippi River trailway as destinations Concrete sidewalk, on west side, from south end to Eastwood Dr. On street marked 4’ wide striped lane, both sides, from CR H to CR H2 and CR I to Eastwood Gaps: North end west from Eastwood Dr to Groveland Rd has no controlled walk/bike features. No striping between CR H2 to CR I Plan: Future implementation extension of trailway with local street project Edgewood Drive Yes Yes • Connects Edgewood MS, City Hall, City Hall Park, Police Station and Community Center Concrete sidewalk, east side, and 6’ striped lanes, both sides, from CR H to CR H2. Concrete sidewalk, west side, from CR H2 to CR 10, and both sides from CR 10 to Bronson Ave, changing to striped lanes, both sides, to CR I. MSA route from south border to CR I Gap: No sidewalk north of Bronson. No controlled walk/bike features north of CR I Plan: Future improvement implementation of trailways with local street project and addition of formal trailway through wooded area between CR I and Hillview Rd Quincy Street Yes Yes • Connects Oakwood and Greenfield Parks, Pinewood Elementary and industrial park Striped 6-10’ lanes, both sides, from CR 10 to Hillview RdCR I. Concrete sidewalk, on east side, from Hillview Rd to CR H2. MSA route along majority of length Gap: Bikes must use sidewalkNo sidewalk from CR 10 to CR H2 Plan: Future implementation of bikeway sidewalk with local street project