Laserfiche WebLink
Trailway System Plan - DRAFT 10 MS, Irondale HS, Sunnyside Elementary • Connection to Rice Creek, TCAAP and Fridley trailways then transitions to paved trailway to Old Hwy 8 Gap: No south side walkway from Silver Lake Rd to Edgewood Dr. No controlled walk/bike features from Old Hwy 8 to east end (35W) or to TCAAP Plan: Implement needed features with local street and Co Rd H and 10 intersection projects Park Trailways Bike- way Walk- way Connecting Landmarks and Trailways Status – Gaps - Plans Silver View Park Yes Yes • Connects with Long Lake Rd, Silver Lake Rd, CR H and I trailways Complete – Paved Gap: NA Plan: Maintain Greenfield Park Yes Yes • Connects with Hillview Rd and Quincy St trailways and Oakwood Park Trailway is a mix of paved and gravel Gap: Gravel portions not conducive to biking. Bridges need attention. Plan: Pave complete trail and repair/replace bridges. Add bridge to Laport Arden Park No Yes • Connect with Long Lake Rd and Arden Ave trailway • Connection with Blaine trailway along CR J/ 85th Ave Future – Walkway from Edgewood Dr along sound wall, behind park, to Long Lake Rd Gap: Does not exist Plan: Future implementation of gravel or paved walkway Woodcrest Park No Yes • Connect with Silver Lake Rd trailway Complete – Gravel Gap: NA Plan: Maintain