Laserfiche WebLink
Trailway System Plan - DRAFT 12 Fill the Gaps Priorities Short Term: • Complete CR H walkway (sidewalk) between Edgewood Drive and Silver Lake Road. Coordinate with area street construction project in area. Medium Term: • Complete CR 10 trailways (North and South sides) • Complete Long Lake Rd trailway at along north end (North County Line) to CR J/ 85th Ave and to Groveland Rd • Continuation of existing walkways along main E/W and N/S routes. Must define purpose of striped lanes or acceptable uses, and if bike use of sidewalks is acceptable.