My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-23-2014 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2014
>
01-23-2014 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:50:31 PM
Creation date
4/2/2020 6:16:21 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works Staff Report <br />2/3 <br />• Shelter Building Improvements: Involves replacing west side roof gable sheeting and interior <br />improvements to the floor, lighting, and other miscellaneous repairs and upgrades. 2014 Budget: <br />$10,000 (PDF) + $3,500 (General Fund). <br />• Replace Shelter Picnic Tables and Amenities: Remove original six bench tables and replace with an <br />equivalent number of square picnic tables of like kind installed at Lambert Park. Also replace trash <br />containers and install bike racks, benches, etc. at various locations. Public Works received 30+ free <br />new recycling containers from Ramsey County which will be situated next to each trash container. <br />2014 Budget: $10,000 (PDF) + $5,600 BBC contribution (PDF) for use at various other parks as well. <br />• Irrigation Improvements: Expand irrigation system to cover various locations including around shelter <br />and new playground. 2014 Budget: $10,000 (PDF). The main irrigation underground control vault will <br />also be replaced with an above ground control. 2014 Budget: $5,000 (General Fund). <br />Lambert Park: <br />• Replace Interior Furniture: Replace tables and chairs with new. 2014 Budget: $3,000 (PDF) – which is <br />funded entirely by BBC contributions (Nov. 2013). <br />Hillview Park: <br />• Reroof Shelter: Replace asphalt shingle roof with new. This was originally budgeted for 2013 and <br />unable to be completed prior to winter. Estimated cost is $8,500 which could be covered with 2014 <br />budget under-runs or by amending the adopted budget. <br />City Hall Campus: <br />• Irrigation & Landscaping Improvements: The front of City Hall is planned to have new landscaping <br />features installed and irrigation system expanded to cover dead spots and the portion of the park <br />between City Hall and County Highway 10 (volley ball area). 2014 Budget: $25,000 (Spec. Projects <br />Fund). <br /> Groveland Park: <br />• Tennis/Basketball Court Rehabilitation (Design): Involves evaluation, design, and bidding documents <br />for option selected, to be constructed in 2015. 2014 Budget: $15,000 (PDF). <br />Trails/Sidewalk: <br />• Long Lake Road (Red Oak to Eastwood): This high priority “missing link” is planned to be constructed <br />with the 2014 Area G Street Project. Public Works is soliciting property owner feedback and will <br />recommend a 5-foot bike lane and 6-foot concrete sidewalk with barrier curb between. <br />• County Road H Sidewalk (Silver Lake Road to Edgewood Drive): Public Works is pursuing a Safe Routes <br />to School (SRTS) grant to cover 80% of construction costs. This is a competitive grant and the <br />application is due by the end of January 2014. Estimated project costs: $275,000. <br />• Trailway Maintenance: Public Works is planning to crack seal and seal coat most of the asphalt <br />pavement trailways in Mounds View. <br />Community Center: <br />• Masonry Renovation: Tuck point mortar and repair exterior brick and tile walls (includes City Hall <br />building). 2014 Budget: $30,000 (Spec. Projects Fund). Multi-colored tile block will also be painted to <br />create a civic campus “feel” with City Hall. 2014 Budget: $4,500 (Comm. Center Fund). <br />• Retrocommissioning Improvements (Phase 1): HVAC and energy upgrades. 2014 Budget: $75,000 <br />(Spec. Projects Fund). <br />• Gym Floor Rehabilitation: Buff and coat hardwood floors. 2014 Budget: $7,500 (Comm. Center Fund). <br /> <br />Forestry <br />Public Works will be charting a new path after 32 years of forestry expertise by Rick Wriskey ended in <br />December 2012. Forestry activities were limited during 2013 and Public Works has a plan to increase <br />activities in 2014 and beyond. Public Works has been unsuccessful in finding another municipality to share a
The URL can be used to link to this page
Your browser does not support the video tag.