Laserfiche WebLink
Public Works Staff Report <br />2/2 <br />• Replace Shelter Picnic Tables and Amenities: Remove original six bench tables and replace with an <br />equivalent number of square picnic tables of like kind installed at Lambert Park. Also replace trash <br />containers and install bike racks, benches, etc. at various locations. Public Works received 30+ free new <br />recycling containers from Ramsey County which will be situated next to each trash container. 2014 <br />Budget: $10,000 (PDF) + $5,600 BBC contribution (PDF) for use at various other parks as well. <br />• Irrigation Improvements: Expand irrigation system to cover various locations including around shelter and <br />new playground. 2014 Budget: $10,000 (PDF). The main irrigation underground control vault will also be <br />replaced with an above ground control. 2014 Budget: $5,000 (General Fund). <br />Lambert Park <br />• Replace Interior Furniture: Replace tables and chairs with new. 2014 Budget: $3,000 (PDF) – which is <br />funded entirely by BBC contributions (Nov. 2013). <br />Hillview Park <br />• Reroof Shelter: Replace asphalt shingle roof with new. This was originally budgeted for 2013 and unable <br />to be completed prior to winter. Estimated cost is $8,500 which could be covered with 2014 budget <br />under-runs or by amending the adopted budget. BBC donation of $1,785 (Feb. 2014). <br />City Hall Campus <br />• Irrigation & Landscaping Improvements: The front of City Hall is planned to have new landscaping features <br />installed and irrigation system expanded to cover dead spots and the portion of the park between City Hall <br />and County Highway 10 (volley ball area). 2014 Budget: $25,000 (Spec. Projects Fund). <br /> Groveland Park <br />• Tennis/Basketball Court Rehabilitation (Design): Involves evaluation, design, and bidding documents for <br />option selected, to be constructed in 2015. 2014 Budget: $15,000 (PDF). <br />Trails/Sidewalk <br />• Ardan Avenue (Red Oak to Long Lake Road): The City Council approved the addition of a six-foot sidewalk <br />to the north boulevard of the Ardan Avenue reconstruction in Area G of the street project (2/24). <br />Engineering staff recommended that this be re-evaluated since it was not previously approved with the <br />non-standard street design. A “shared-use” parking lane is included on the south (eastbound) side. <br />• Long Lake Road (Red Oak to Eastwood): This high priority “missing link” is planned to be constructed with <br />the 2014 Area G Street Project. Public Works is soliciting property owner feedback and will recommend a <br />5-foot bike lane and 6-foot concrete sidewalk with barrier curb between. Engineering met with Ramsey <br />County Public Works on 2/20 to discuss improvements. RCPW has issues with the addition of curb and <br />indicated this section of Long Lake Road will be rehabilitated in the next year or two, at which time RCPW <br />will widen out the shoulder to accommodate on-street pedestrian/bicycle traffic. <br />• County Road H Sidewalk (Silver Lake Road to Edgewood Drive): Public Works is pursuing a Safe Routes to <br />School (SRTS) grant to cover 80% of construction costs. This is a competitive grant and the application is <br />due by the end of January 2014. Estimated project costs: $275,000. Grant application submitted – award <br />notices anticipated in June/July 2014. <br />• Trailway Maintenance: Public Works is planning to crack seal and seal coat most of the asphalt pavement <br />trailways in Mounds View. <br />Community Center <br />• Masonry Renovation: Tuck point mortar and repair exterior brick and tile walls (includes City Hall <br />building). 2014 Budget: $30,000 (Spec. Projects Fund). Multi-colored tile block will also be painted to <br />create a civic campus “feel” with City Hall. 2014 Budget: $4,500 (Comm. Center Fund). <br />• Retrocommissioning Improvements (Phase 1): HVAC and energy upgrades. 2014 Budget: $75,000 (Spec. <br />Projects Fund). Retrocommissioning report approved on 3/24/2014. <br />• Gym Floor Rehabilitation: Buff and coat hardwood floors. 2014 Budget: $7,500 (Comm. Center Fund). <br />Scheduled for the week of 3/17. Work completed the week of 3/10/2014.