ia N Zr,*),Vf,75TfJTZi <br />Memo To :Mary Saarion, Director of Parks and Recreation <br />From :Ric Minetor, City Engineer/Director of Public Works <br />Date :October 30, 1989 <br />Subject :Greenfield Park Baseball Field Expansion <br />I have developed a rough estimate of the cost of extending the <br />right field line to 300 feet. The main cost is the piping and <br />filling of the ditch adjacent to right field. I assumed a total <br />of 200 feet of ditch will need to be piped. The cost of the pipe, <br />fill, fence relocation and turf establishment is approximately <br />$26,300. The major cost is the fill required which accounts for <br />$17,400 of the total. This is a rough estimate and the intent is <br />only as a preliminary study cost. The costs are based on the <br />following assumptions. <br />Greenfield Ballfield Extension <br />Assume 200 feet of ditch to be piped <br />Assume 24 inch diameter pipe <br />Assume all embnkment needs to be brought in <br />Pipe - 200 feet @ $12/ft $ 2,400 <br />Embankment-1450*$12 17,400 <br />Seeding, Topsoil, etc-200*30*$.50 3,000 <br />Fencing - Relocate & add'tl. 3,500 <br />$26,300 <br />