My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/24/1990
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
1990-1999
>
1990
>
05/24/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 2:44:30 PM
Creation date
4/13/2020 1:23:12 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
Supplemental fields
Date
5/24/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROCEDURE FOR AMENDMENT <br />Procedures for the amendment of the Silver View Park Master Plan is as follows: <br />1. The Park and Recreation Commission must review any amendment to the plan. <br />2. The Council upon recommendation from the Parks and Recreation Commission <br />will review the amendment. <br />3. A public hearing must be held. <br />4. Final approval by simple majority of the Council must be given by resolution. <br />The criteria of any amendment is that it follows the concept plan described in this <br />plan. <br />AMPHEMEATER <br />Provisions for the re -sloping of the amphitheater will be made as funds and manpower <br />are available. <br />Two smaller bridges or culverts are suggested for the nature path located in the gully <br />area off of the Silver Lake Road access and the area along Long Lake Road near the <br />Scotland Green parking lot. <br />PARK MAINTENANCE PROPOSAL <br />It was affirmed by the Silver View Task Force Committee that the maintenance <br />expectation of Silver View Park exceeds the present capabilities of the City. The Task <br />Force does not recommend lowering the expectation, but instead makes a <br />recommendation to the City Council to hire a seasonal employee from May until <br />September for the purpose of performing park maintenance at Silver View Park. <br />Duties would include pathway maintenance, pond buffer area trimming, litter pick-up, <br />cleaning the picnic shelter, tending bushes and plants, watering trees, sweeping <br />basketball court, raking the sand volleyball court and inspection of equipment and <br />facilities. This maintenance employee, if headquartered at the picnic shelter, could <br />house equipment and supplies in the storage room. <br />SPRINKLING SYSTEM EXPANSION <br />For future turf maintenance and park beautification, it is important to water the grass <br />to ensure grass growth. The sprinkling system mechanics are already installed <br />including a pump and electrical timer. The system was specified with the capabilities <br />and expectations for future expansion to the soccer field and picnic shelter area. The <br />expansion cost would simply be additional pipe, sprinkler heads and installation labor. <br />H <br />
The URL can be used to link to this page
Your browser does not support the video tag.