Laserfiche WebLink
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM <br />SILVER VIEW COMMUNI71Y PARK <br />IMPROVEMENTS <br />MARCH, 1990 <br />FACILITY: <br />Sprinkling System Addition <br />PRIMARY ACTIVITY/FUNCTION: <br />To water the area around the picnic shelter and the soccer field. <br />PLAN DESCRIPTION: <br />Tap into the existing system and add additional sprinkling area as <br />anticipated when the sprinkling system was first installed. <br />GENERAL MAINTENANCE CRITERIA: <br />Annual autumn blow-out of the system, inspection of heads and repair of <br />any broken pipes. <br />GENERAL DESIGN CRITERIA: <br />Similar equipment that is the same or adaptable to the present system. <br />40 <br />