Laserfiche WebLink
� PINEWOOD PLAYFIELD IMPROVEMENTS <br />The following are field improvements proposed by the City of Mounds View: <br />* Remove the backstop and benches of the northeast field and let this field grow over. Cost <br />is $ <br />* Cut out the grass infield of the southwest field and install 100 yards of ag-lime and level <br />for a multi-purpose field. Cost is $ <br />EDGEWOOD PLAYFIELD IMPROVEMENTS <br />The following are field improvements proposed by the City of Mounds View: <br />* Add 125 yards of ag-lime infield material to both lower fields and, baseball field. <br />Estimated 8 hours of labor for 2 persons at $19 / hour = $304 <br />Estimated cost of ag-lime = <br />Equipment costs: <br />Grader at $50/hr tack time = <br />Dump truck at $50/thour = <br />Loader at $50/hr= <br />