Laserfiche WebLink
The Mounds View Vision <br />A Thriving Desirable Community <br /> <br />RESOLUTION 9264 <br /> <br />CITY OF MOUNDS VIEW <br />COUNTY OF RAMSEY <br />STATE OF MINNESOTA <br /> <br />APPROVING THE PROPOSAL FROM KLM ENGINEERING FOR ROOF REPAIRS ON <br />THE GROUND RESERVOIR <br /> <br /> <br />WHEREAS, the City has the responsibility to efficiently operate the water <br />distribution system; and <br /> <br />WHEREAS, In 2014 the City Council approved repairs to the ground reservoir <br />(Res 8218) that included interior structural repairs, interior steel coatings, exterior <br />structural repairs, and coating of the exterior roof and flashing; and <br /> <br /> WHEREAS, Staff recently had the ground reservoir inspected by KLM Engineering <br />and upon completion of this inspection; repairs to the roof are required; and <br /> <br />WHEREAS, Staff had KLM Engineering reach out to contractors in order to <br />receive proposals for the needed repairs; one proposal was received from Champion <br />Coatings of Prior Lake, MN. <br /> <br />WHEREAS, The Scope of the repair work will include the following: <br /> <br />• Remove the existing coating by grinding 4-inches, including feathering the existing <br />coating to sound material, on both sides (minimum of 8-inches wide) of expansion and <br />construction joints, as directed by the engineer. The total footage requiring repair is <br />approximately 522-lineal feet. <br />• On all joint repair areas, apply 6-inch wide bond breaker tape per manufacturer’s <br />instructions, similar to those provided by Sherwin Williams. <br />• On areas of cracked coating, not affiliated with joint repairs, remove coating back to <br />tightly adhered coating and feather edges. <br />• Apply, color-matched, Sherwin Williams Envirolastic AR530 to the all repaired areas at <br />a thickness of 60 mils to match existing coating. <br />• Prior to tape or coating application, surfaces shall be clean and dry per coating <br />manufacturer’s recommendation <br /> <br />NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Mounds <br />View, Ramsey County, Minnesota as follows: <br /> <br />1. Approves the proposal from KLM Engineering for roof repairs to the ground <br />reservoir at a cost of $29,904.00. <br />2. Council approves a contingency of 7% or $2,093.00 for any unforeseen issues <br />that may arise during the repair work. For a total project cost not to exceed of <br />$31,997.00. <br /> <br />The Mounds View Vision <br />A Thriving Desirable Community <br />