My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
January thur December 2002
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2002
>
January thur December 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 1:23:50 PM
Creation date
4/23/2020 7:09:53 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LANDSCAPE REMOVAL I REPLACEMENT <br />$800 <br />Remove existing shrubs and trees re -sod any disturbed area <br />$400 <br />SIGNAGE <br />Signs stating the rules and operation of the skate park <br />$720 <br />TRASH RECEPTACLES <br />Provide two heavy-duty trash receptacles <br />$1,800 <br />BENCHES <br />Provide three heavy-duty benches <br />RESTROOMS AND DRINKING FOUNTAIN <br />the facilities inside the Community Center <br />$0 <br />Assume users of the Skate Park will utilize <br />TOTAL INFRASTRUCTURE IMPROVEMENTS <br />$38,720 <br />The total 2003 budget for the Stake Park is $55,000. Therefore, there would only be $16,280 remaining <br />to purchase equipment. Adding tax, the City's buying power is further reduced to $15,280 <br />Infrastructure Improvements $38,720 <br />Skating Equipment $14,710 <br />956 <br />TOTAL $54,386 <br />Attached is a graphic from Skatewave showing a layout costing $14,710. <br />FOR COMPARISON PURPOSES THE SAME EXERCISE WAS PERFORMED FOR THE <br />GROVELAND SITE: <br />RESURFACE THE TENNIS COURT (fill cracks and paint) <br />$1,500 <br />$400 <br />SIGNAGE <br />$720 <br />TRASH RECEPTACLES <br />$1,800 <br />BENCHES <br />PATHWAY TO RESTROOMS AND DRINKING FOUNTAIN <br />BUILD <br />$5,120 <br />TOTAL <br />Infrastructure Improvements $ 5,120 <br />Skating Equipment $46,620 <br />Tax $ 3,030 <br />TOTAL $54,770 <br />Attached is a graphic from Skatewave showing a layout costing $46,620. <br />• Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.