My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-03-2020 WS
MoundsView
>
City Council
>
City Council
>
Packets
>
2020-2029
>
2020
>
08-03-2020 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 2:35:00 PM
Creation date
8/19/2020 2:32:31 PM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
8/3/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 4. <br />Meeting Date: August 3, 2020 <br />Type of Business: Work Session <br />City Administrator Review: ______ <br /> <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Don Peterson, Public Works Director <br />Item Title/Subject: Storm Water/Sump Pump Discharge <br /> <br />As you are aware, storm water management and sump pump discharge are two of the most <br />vexing issues facing our residents and council. In the past year, we amended our ordinance to <br />allow sump pump discharge into the storm sewer as long as it did not cross the sidewalk or impair <br />the road (no discharge in winter). <br /> <br />Staff continues to work with a number of residents, primarily but not all in the NW quadrant where <br />the issue is more pronounced. <br /> <br />Based on a resident who piped his sump pump discharge to the storm drain, staff is proposing <br />we explore the cost, via the issuance of an RFP, to directionally bore into the storm structure <br />allowing this piping to be both underground and directly into the system versus being above grade <br />and causing the problems that accompany surface discharge. The City would absorb the cost of <br />boring through the structure and up to the easement line, the resident would absorb the cost from <br />the easement line to their discharge from the house. <br /> <br />Conclusion <br />Staff is looking for any additional direction from the Council on how they would like to proceed <br />with staff preparing and issue an RFP consistent with the above. <br /> <br />Respectfully Submitted, <br /> <br /> <br />Don Peterson
The URL can be used to link to this page
Your browser does not support the video tag.