My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2020/10/12
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2020
>
Agenda Packets - 2020/10/12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:32 PM
Creation date
10/16/2020 2:25:04 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/12/2020
Supplemental fields
City Council Document Type
City Council Packets
Date
10/12/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COMPREHENSIVE SEWER PLAN <br />Table of Contents <br />EXECUTIVESUMMARY............................................................................................................... <br />1.0 INTRODUCTION...........................................................................................................1.1 <br />1.1 REGULATORY FRAMEWORK.......................................................................................1.1 <br />1.2 PHYSICAL SETTING.......................................................................................................1.1 <br />2.0 FORECASTS..................................................................................................................2.3 <br />3.0 SANITARY SEWER DESIGN CRITERIA...........................................................................3.5 <br />3.1 LAND USE.....................................................................................................................3.5 <br />3.2 ESTIMATED AVERAGE WASTEWATER FLOWS.............................................................3.5 <br />3.3 PEAK FLOW FACTORS.................................................................................................3.5 <br />4.0 SANITARY SEWER TRUNK SYSTEM................................................................................4.7 <br />4.1 EXISTING TRUNK SANITARY SEWER SYSTEM EVALUATION..........................................4.7 <br />4.2 INTERCOMMUNITY FLOWS..........................................................................................4.8 <br />4.3 INDIVIDUAL SEWAGE TREATMENT SYSTEMS (ISTS)......................................................4.8 <br />4.4 PUBLICLY AND PRIVATELY OWNED WASTEWATER TREATMENT PLANTS ...................4.8 <br />5.0 INFILTRATION AND INFLOW(1/1).................................................................................5.9 <br />5.1 GENERAL.....................................................................................................................5.9 <br />5.1.1 SOURCES AND EXTENT OF 1/1.....................................................................5.9 <br />5.1.2 GOALS, POLICIES, AND STRATEGIES TO ADDRESS 1/1.............................5.10 <br />5.1.3 1/1 IMPLEMENTATION PLAN......................................................................5.10 <br />6.0 COST ESTIMATES AND FINANCING..........................................................................6.12 <br />6.1 COST ESTIMATES........................................................................................................6.12 <br />6.2 FINANCING...............................................................................................................6.12 <br />LIST OF TABLES <br />Table 2-1 — Growth Projections — Metropolitan Council............................................................2.3 <br />Table 2-2 — Sewered Growth Projections — Metropolitan Council.............................................2.3 <br />Table 2-3 — Growth Projections by Metershed..........................................................................2.4 <br />Table 2-4 — Average Wastewater Flow Projections — Metropolitan Council..............................2.4 <br />Table 3-1 — System Design Wastewater Unit Flow Rates........................................................3.5 <br />Table 4-1 — Lift Station Data.....................................................................................................4.8 <br />Table 6-1 — Trunk Sewer Capital Improvement Plan..............................................................6.12 <br />LIST OF FIGURES <br />Figure1-1 - Location Map........................................................................................................1.2 <br />Figure 3-1 - Peak Flow Factors................................................................................................3.6 <br />LIST OF APPENDICES <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.