Laserfiche WebLink
Degradation Fee <br />Restoration Cost <br />Overhead Utility Line Repair <br />Penalty for Work Done without a Permit <br />Municipal Water System Fees (Chapter 906 <br />Water Availability Charge (WAC), Residential <br />WAC Charge, Commercial/Industrial <br />Residential Water Usage Base Charge <br />Residential Water — 0 to 12,000 gallons <br />Residential Water — 12,000 to 24,000 gallons <br />Residential Water — Over 24,000 gallons <br />Commercial Water Usage Base Charge <br />Commercial Water — 0 to 125,000 gallons <br />Commercial Water — 125,000 to 700,000 gallons <br />Commercial Water— 700,001 to 1,100,000 gallons <br />Commercial Water — Over 1,100,000 gallons <br />Water Quality Testing Charge (State) <br />Water Service Line Repair Insurance Charge <br />Failure to participate or grant access regarding <br />Public Works Ordinance Programs. <br />(Installation/Repair/Inspect/Replace) <br />Utility Bill Late Payment <br />Utility Bill Assessment Search <br />Water Service Connection/Repair/Disconnect <br />Size Less than 4 Inches <br />Water Service Connection/Repair/Disconnect <br />Size Over 4 Inches <br />Water Service Inspection or Reinspection After <br />Hours <br />Manual Water Meter Read <br />Hydrant Meter Deposit <br />Hydrant Meter Rental (One Week Minimum) <br />Water Shut-Off/Turn-On <br />Water Shut-Off/Turn-On (Snowbirds) <br />Water Meter Testing <br />Water Testing <br />Water Meter <br />Water Meter Radio Remote Reading Device <br />Curb Stop — Valve Cover <br />Municipal Sanitary Sewer System Fees (ChaptE <br />L ateFal SeweF Line InspeGtieR 1/1 Application Fee — <br />H2OPP Program <br />Sewer Service Availability Charge (SAC) <br />Sewer Usage Rate <br />Sewer Usage Rate <br />Sewer Service Charge, Residential <br />Sewer Service Charge, Commercial/Industrial/ <br />Public Buildings and Churches <br />Calculated at time of permit <br />Calculated at time of permit <br />No Charge <br />Double Fee 50% <br />$500 per unit <br />$1,000 per acre of developable land ($1,000 <br />minimum charge) <br />$�00 19.00 per quarter <br />$2 40 2.50 per 1,000 gallons per quarter <br />$2�4 2.75 per 1,000 gallons per quarter <br />$8-334 3.48 per 1,000 gallons per quarter <br />$44-.00 19.00 per quarter <br />$2:40 2.50-per 1,000 gallons per quarter <br />$2.64 2.75 per 1,000 gallons per quarter <br />$2.W 3.02 per 1,000 gallons per quarter <br />$3-34 3.48 per 1,000 gallons per quarter <br />$2.43 per connection per quarter <br />$8.00 per connection per quarter <br />$150 per connection per quarter <br />10% of delinquent bill amount <br />$10 <br />$100 plus surcharge <br />$150 plus surcharge <br />After hours call -out rate per visit *Minimum 2 Hours <br />call -out rate per visit <br />$2,500 <br />$50 per week <br />$150 per month <br />No charge during normal business hours, otherwise <br />one hour at call -out rate per visit <br />$25 per shut —off <br />$25 per turn -on <br />Call -out rate per visit *Minimum 2 Hours <br />One hour at call -out rate <br />City cost plus 10% administrative fee <br />City cost plus 10% administrative fee <br />City cost plus 10% administrative fee <br />907) <br />$150 per lateral line <br />$2,485 per Metropolitan Council Environmental <br />Services <br />Per Quarter <br />$3-.2 3.14 per 1,000 gallons water sold per quarte <br />$37.96 39.48 per residential equivalent unit (REU) <br />connection per quarter <br />$93.24 96.97- per REU Connection per quarter <br />2021 Mounds View Fee Schedule Page 11 of 12 <br />