Laserfiche WebLink
Sewer Connection/Repair/Disconnect <br />$100 plus surcharge <br />Sewer Unit Charge New Connection Only) <br />$150 per connection <br />Sewer Inspection or re -inspection after hours. <br />Call -out rate per visit *Minimum 2 Hours <br />Surface Water Management (SWM) Utility Fees Chapter 908) <br />SWM New Construction, R-1 <br />$212 per lot <br />SWM New Construction, R-2 <br />$1,038 per acre <br />SWM New Construction, R-3, R-4, R-O <br />$1,500 per acre <br />SWM New Construction, B-1, B-2, B-3, B-4 <br />$1,500 per acre <br />SWM New Construction, 1-1, PUD <br />$2,096 per acre <br />SWM Utility Rate Charge, R-1 Single Family and R- <br />2 Single and Two Family Residential <br />$13.00 14.00 per unit per quarter <br />SWM Utility Rate Charge, R-3 Medium Density <br />Residential <br />$71.08 76.55 per acre per quarter <br />SWM Utility Rate Charge ,R-4 High Density <br />Residential, R-5 Mobile Homes and R-O Residential <br />Office <br />$84.29 90.77 per acre per quarter <br />SWM Utility Rate Charge ,13-1 Neighborhood <br />RiisinPss, R-2 Limited Business, B-3 Highway <br />Business and B-4 Regional Business <br />$110.41 118.90 per acre per quarter <br />SWM Utilit Rate Charge, 1-1 Industrial <br />$86-:20 92.83 per acre per quarter <br />SWM Utility Rate Charge, PUD Planned Unit <br />Development <br />$97.76 105.28 per acre per quarter <br />SWM Utility Rate Charge, CRP Conservancy, <br />Recreation and Preservation <br />$12.00 14.00 per acre per quarter <br />SWM Utility Rate Charge, School or Church, Public <br />or Private <br />$30:67 42.72 per acre per quarter <br />Illicit Discharge Fee <br />To be determined by the Public Works Director on a <br />case by case scenario. <br />Street Lighting Utility Fees Chapter 904 <br />Residential (single family homes, duplexes, <br />fourplexes, condominium and townhomes) <br />$4.50 per unit per quarter <br />Commercial/industrial_ <br />$21.09 per acre per quarter <br />Institutional/Charitable <br />$21.09 per acre per quarter <br />Apartments <br />$21.09 per acre per quarter <br />Construction Site and Land Disturbance Fees (Ordinance 804, Chapter 1303) Additional Fees May <br />be Required for Legal and Engineering Costs Incurred by the City. <br />50 Cubic Yards or Less <br />$25 <br />51 to 100 Cubic Yards <br />$50 <br />101 to 1,000 Cubic Yards <br />$50 base fee plus $20 for each 100 cubic yards or <br />fraction thereof <br />1,001 to 10,000 Cubic Yards <br />$250 base fee plus $35 for each 1,000 cubic yards or <br />fraction thereof <br />10,001 to 100,000 Cubic Yards <br />$500 base fee plus $100 for each 10,000 cubic yards <br />or fraction thereof <br />100,001 Cubic Yards or More <br />$1,500 base fee plus $250 for each 100,000 cubic <br />yards or fraction thereof <br />Other Miscellaneous Public Works Fees <br />Load Limit Waiver (Must be authorized by the Public <br />Works Director <br />$125 per trip <br />Call -Out Charge for Contractor Negligence (Lack of <br />Maintenance, Traffic Signs, Etc. <br />Call -out rate per visit *Minimum 2 Hours <br />Water Tower Telecommunications Maintenance or <br />Repair Access Fee <br />No charge if during normal business hours, otherwise <br />2 hour minimum charge for each after hours call -out <br />Water Tower Telecommunications Plan Review and <br />Inspections <br />Actual legal and consulting engineering costs plus <br />$125 for administration costs and 1,000 escrow. <br />2021 Mounds View Fee Schedule Page 12 of 12 <br />