My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2021/02/22
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2021
>
Agenda Packets - 2021/02/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:32 PM
Creation date
3/16/2021 12:14:26 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/22/2021
Supplemental fields
City Council Document Type
Packets
Date
2/22/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Technical Memorandum <br />Re: Mounds View — Water Treatment Plant No. 1 Rehabilitation Project <br />February 22, 2021 <br />WELLHOUSE IMPROVEMENTS <br />In addition to the work completed at WTP No. 1, portions of Wellhouse 1 and Wellhouse 2 will be <br />rehabilitated. These wells provide raw water to WTP No. 1. Rehabilitation within these wellhouses <br />includes the following: <br />Wellhouse 1 <br />Complete electrical replacement including upgrading Well No. 1 motor with a VFD for <br />more efficient operation <br />2. Select valve and instrument replacement <br />3. Sound dampening of walls shared with police department <br />Wellhouse 2 <br />1. Electrical replacement limited to lighting and SCADA control equipment <br />2. Select valve and instrument replacement <br />In addition to the improvements listed above, both facilities will also have security and door <br />access hardware added to standardize equipment throughout all facilities. Included in the bidding <br />documents is Alternate 1, which is for the addition of air conditioning units within the two <br />wellhouses to ventilate and cool the space of excess heat coming from the well VFDs. <br />ESTIMATED COSTS <br />The estimated costs of the required improvements are summarized below: <br />Description <br />Estimated Cost <br />100% Engineers Construction Estimate (Includes 10% Contingency) <br />$1,909,800 <br />Engineering Construction Administration Phase Services <br />$190,000 <br />Construction Phase I&C Programming <br />$110,000 <br />Total Estimated Remaining Costs <br />$2,209,800 <br />NEXT STEPS <br />The following tentative timeline is proposed for the bidding package described herein: <br />1. Request to authorize bid advertisement at February 22nd, 2021 Council Meeting <br />2. Publish bid advertisement on February 23rd, 2021 <br />3. Conduct bid opening on March 23rd, 2021 at 2:00 PM — to be conducted virtually <br />4. Award construction contract at April 12t", 2021 Council Meeting <br />P07008-2073-007 Page 3 of 5 <br />Think Big. Go Beyond. v .0 p www.ae2s.com <br />i ■7�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.