Laserfiche WebLink
Mounds View 2019 WTP Rehab Project <br />AE2S Project #P05367-2016-000 <br />Opinion of Probable Total Construction Cost <br />Site <br />Subtotal 00/01 000Contracting an GeneralRequirements <br />1 7,720 <br />T • <br />8,003 <br />Revision: <br />7 <br />2/17/2021 <br />1 7 <br />Subtotal 02 0000 Existing Conditions <br />$20,000 <br />$20,000 <br />$10,000 <br />$10,000 <br />Subtotal 03 0000 Concrete <br />$0 <br />$0 <br />$20,000 <br />$31,000 <br />Subtotal 04 0000 Masonry <br />$0 <br />$0 <br />$0 <br />$0 <br />Subtotal 05 0000 Metals <br />$0 <br />$0 <br />$0 <br />$6,100 <br />Subtotal 06 0000 Woods,Plastics, and Composite <br />$0 <br />$0 <br />$0 <br />$0 <br />Subtotal 07 0000 Thermal and Moisture Protection <br />$0 <br />$0 <br />$0 <br />$3,000 <br />Subtotal 08 0000 Doors and Windows <br />$3,420 <br />$3,420 <br />$0 <br />$33,800 <br />Subtotal 09 0000 Finishes <br />$39,025 <br />$39,025 <br />$5,000 <br />$66,600 <br />Subtotal 10 0000 Specialties <br />$1,000 <br />$1,000 <br />$1,000 <br />$100 <br />Subtotal 12 0000 Furnishings <br />$0 <br />$0 <br />$0 <br />$0 <br />Subtotal 21 0000 Fire Protection <br />$0 <br />$0 <br />$0 <br />$0 <br />Subtotal 22 0000 Plumbing <br />$16,750 <br />$29,000 <br />$6,500 <br />$40,000 <br />Subtotal 23 0000 Mechanical <br />$26,500 <br />$26,500 <br />$10,000 <br />$85,000 <br />Subtotal 26 0000 Electrical <br />$382,570 <br />$375,070 <br />$321,700 <br />$562,310 <br />Subtotal 31 0000 Earthwork <br />$0 <br />$0 <br />$0 <br />$9,000 <br />Subtotal 32 0000 Exterior Improvements <br />$0 <br />$0 <br />$10,000 <br />$112,000 <br />Subtotal 33 0000 Utilities <br />$0 <br />$0 <br />$7,200 <br />$11,900 <br />Subtotal 40 0000 Process Integration <br />$315,380 <br />$315,3801 <br />$127,480 <br />$405,390 <br />Subtotal 43 0000 Process Gas and Liquid Handling, Purification, and Storage Equipment <br />$39,300 <br />$39,300 <br />$0 <br />$56,400 <br />Subtotal 46 0000 Water and Wastewater Equipment <br />Subtotal <br />FinalDesign- <br />95% Engineer's Estimate (10% Contingency) <br />$294,210 <br />WTP 2 <br />294,210 <br />WTP 3 Booster <br />0 <br />Sta. <br />163,608 <br />WTP 1 <br />$1,909,800 <br />As -Bid Construction Costs <br />$3,061,900 <br />Approved Change Orders to Dot <br />Exterior Building Repairs by Others (Allowance) <br />$90,000 <br />$31,662 <br />$85,000 <br />$0 <br />$0 <br />$0 <br />Additional I&C Hardware & Installation (2 LS, PW Master) <br />$78,000 <br />$0 <br />Additional Engineering Phase Services (Pilot Study) <br />$40,000 <br />Additional Engineering Phase Services (Bid Package 2 Bidding Phase) <br />$20,000 <br />Engineering Construction Phase Services (Future Contract) <br />$226,464 <br />$158,586 <br />$190,000 <br />Construction Phase I&C Programming (Future Contract <br />$110,000 <br />Estimated Total Bid Package Costs <br />$3,731,612 <br />$2,269,800 <br />Estimated Total Project Costs <br />$6,001,412 <br />Cost Estimate - Mounds View 2019 WTP Rehab - 12.28.2020.xlsx/Summary Page 1 of 1 <br />