Laserfiche WebLink
CD <br />z <br />0 <br />Q <br />CD <br />w� <br />Jz <br />o� <br />O <br />LL- U <br />�Q <br />O <br />Y <br />O <br />� <br />LANMH <br />U Q <br />RIM=903.72 <br />INV(N)=895.72 <br />INV(S)-895.67 <br />0 <br />-< s <br />< <br />3:--------------- <br />Z O <br />� U <br />O <br />_:2 w <br />� V) <br />O Q <br />U <br />0 <br />iL — <br />�G GGH �0� P G\ �'ON —i — P- H <br />905------- -------------------- - - ------------ <br />---------------- -- ----- <br />----------------------- <br />PLEASANT VIEW DRIVE/ <br />STINSON BOULEVARD <br />— — — — — 4- <br />CITY/COUNTY <br />LINE <br />EXISTING <br />RESIDENCE <br />j- <br />B618 CONCRETE CURB I LEGEND <br />AND GUTTER PER <br />MN/DOT STANDARD ��I _ I EXISTING BITUMINOUS PAVEMENT <br />PLATE 7100 (TYP.) 03 I „ i P-OH <br />I \ <br />SON iil I co _ <br />PROPOSED BITUMINOUS PAVEMENT <br />l <br />-AP ' 9� / <br />------ ---- ----------------- �_ <br />.AN <br />SM H <br />' <br />/IM=908.73 0�'` ;I <br />INV=897.03 /� <br />-- --/ -- I-- -- w, O <br />\ \ \ WM M H <br />\\ \�\ RIM=911.56, ill <br />\ \ \ rl I <br />---------- �-- — -------- ---- \------------ <br />/ <br />G <br />G Gi�91 � <br />�N \\ 97 <br />\ <br />\ <br />\ <br />—y11—s��llr►' '�� � v <br />c� <br />00 <br />EXISTING _ < <br />RESIDENCE <br />��-912_—� x\ ° <br />�I V <br />0 <br />Orn <br />i <br />I <br />I <br />I <br />I <br />I <br />I — <br />r <br />I <br />I <br />I <br />I <br />� i I <br />SEDIMENT CONTROL LOG PER 2 (2 <br />2 <br />DRAINAGE ARROW <br />E.O.F. EMERGENCY OVERFLOW ELEVATION <br />=XXX.X <br />I GENERAL NOTES: <br />1. PRIOR TO IMPORTING OR EXPORTING MATERIAL TO OR FROM <br />THE SITE, CONTRACTOR SHALL CONSTRUCT A STABILIZED <br />CONSTRUCTION EXIT PER . <br />2 <br />2. SEE SHEET 3 FOR THE LOT TABULATION. <br />3. SEE SHEET 6 FOR THE UTILITY PLAN. <br />4. SEE SHEET 7 FOR THE RESTORATION AND PAVING PLAN. <br />5. STREETS AND PROPERTIES ADJACENT TO THE SITE SHALL BE <br />KEPT FREE FROM SEDIMENT CAUSED BY CONSTRUCTION <br />TRAFFIC, SITE RUNOFF AND BLOWING DUST. <br />6. ALL SLOPES SHALL BE 4:1 OR FLATTER. <br />7. STABILIZATION OF DISTURBED AREAS SHALL BE INITIATED <br />IMMEDIATELY TO LIMIT SOIL EROSION WHEN CONSTRUCTION <br />ACTIVITY HAS PERMANENTLY OR TEMPORARILY CEASED AND <br />WILL NOT RESUME FOR A PERIOD EXCEEDING 14 CALENDAR <br />DAYS. STABILIZATION MUST BE COMPLETED NO LATER THAN <br />14 CALENDAR DAYS AFTER THE CONSTRUCTION ACTIVITY <br />HAS CEASED. <br />8. SEE T1FOR LOT PAD GRADING DETAIL. <br />REFERENCE NOTES: <br />1� CONSTRUCT INFILTRATION BASIN PER 3 . <br />2 <br />�2 THE PERIMETER SEDIMENT CONTROL LOG SHALL BE PLACED <br />PRIOR TO CONSTRUCTION. THE REMAINING SEDIMENT <br />CONTROL LOG SHOWN SHALL BE PLACED AFTER THE <br />COMPLETION OF GRADING. <br />�3 DROP THE BACK OF THE CURB AT THE PROPOSED <br />DRIVEWAY LOCATIONS ON THE EAST SIDE OF PLEASANT <br />VIEW DRIVE. <br />20 0 20 40 <br />SCALE IN FEET <br />DATE <br />REVISION <br />I hereby certify that this plan, specification, or report was <br />prepared by me or under my direct supervision and that I <br />am a duly Licensed Professional Engineer under the laws <br />of the State of Mi ta. <br />DESIGNED BY: <br />TAE <br />Hakanson Anderson <br />� Civil Engineers and Land Surveyors <br />3601 Thurston Ave., Anoka, Minnesota 55303 <br />763-427-5860 FAX 763-427-0520 <br />www.hakanson-anderson.com <br />BELDEN RIVER VIEW <br />GRADING DRAINAGE AND <br />EROSION CONTROL PLAN <br />CITY OF MOUNDS VIEW, MINNESOTA <br />SHEET <br />5 <br />OF <br />7 <br />SHEETS <br />2 4 21 <br />PLAN REVISIONS PER CITY REVIEW <br />DRAWN BY: <br />TAE <br />I OTHY A. �T0el-IS, P.E. <br />Date 1 4 21 Lic. No. 43362 <br />CHECKED BY: <br />CJJ <br />4535.01 <br />