Laserfiche WebLink
Public Works Staff Report <br />The following is the List of Parks and projects / maintenance activities ongoing or planned this year. <br />Current updates are in black text, and updates from the previous two month period are in grey. <br />Ardan Park <br />• Working with Stantec Engineering on some drainage issues in the Park. Application to <br />perform some storm water pond maintenance was submitted to RCWD. <br />• Work to be scheduled for this winter <br />City Hall Campus: <br />New Picnic Shelters are being built, will be ready for next season rental. <br />Worked with plumber and vendor to winterize the splash pad. <br />Installation of the New Picnic Tables started <br />Groveland Park: <br />• Final Inspection of Punch list items on 10/25/2018 for Tennis/Basket Ball Court <br />Greenfield Park: <br />Notified by the DNR that corrections to be made to the tennis court gate entrance — ADA <br />accessible. Fencing contractor scheduled for next month Leveled the trail running in the <br />back portion of the Park, added class 5 as needed. <br />Commission will need to discuss at the August 2020, Green field baseball field. Take out <br />all turf from first and third base line and replace with Ag-lime to the fence. Most all new <br />park construction is going this way with ball fields. This would solve the wet home plate <br />issue and uneven base line issues. <br />• Building has been re -roofed <br />Hillview Park: <br />■ Hockey rink fence completed, Public Works staff completed installing the boards. Grading <br />and fill need to be completed. Depending on the weather the base may be a 2018 project. <br />• Ag-lime base to be completed in 2018. <br />• Commission will need to discuss at the August 2020, playground Rehabilitation. <br />Lambert Park <br />• Inventory of Hockey Rink boards to re -place started. <br />• Commission will need to discuss at the August 2020 Meeting size of the Hockey Rink. <br />Random Park: <br />Commission will need to discuss at the August 2020, playground Rehabilitation <br />2 1 P a g e <br />