My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-25-2021
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2020-2029
>
2021
>
02-25-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2021 1:26:03 PM
Creation date
3/24/2021 1:23:41 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works Staff Report <br />Groveland Park: <br />• Final Inspection of Punch list items on 10/25/2018 for Tennis/Basket Ball Court <br />Greenfield Park: <br />Notified by the DNR that corrections to be made to the tennis court gate entrance — ADA <br />accessible. Fencing contractor scheduled for next month Leveled the trail running in the <br />back portion of the Park, added class 5 as needed. <br />Commission will need to discuss at the August 2020, Green field baseball field. Take out <br />all turf from first and third base line and replace with Ag-lime to the fence. Most all new <br />park construction is going this way with ball fields. This would solve the wet home plate <br />issue and uneven base line issues. <br />Building has been re -roofed <br />Hillview Park: <br />Furnace at Park Shelter is scheduled to be replaced in the next two weeks, cold weather <br />delayed the contractor from installing. <br />Hockey rink fence completed, Public Works staff completed installing the boards. Grading <br />and fill need to be completed. Depending on the weather the base may be a 2018 project. <br />• Ag-lime base to be completed in 2018. <br />• Commission will need to discuss at the August 2020, playground Rehabilitation. <br />Lambert Park <br />• Inventory of Hockey Rink boards to re -place started. <br />• Commission will need to discuss at the August 2020 Meeting size of the Hockey Rink. <br />Random Park: <br />■ Commission will need to discuss at the August 2020, playground Rehabilitation <br />Silver View Park <br />Ramsey County continues to work in re -profiling the draining ditch along County Road I <br />and Silver View Road, located in Silver View Park. <br />Four new pond aerators installed in the Storm Water Pond <br />Woodcrest Park <br />• Working with Stantec Engineering and Ramsey County on some drainage issues in the <br />Park. Application to perform some storm water pond maintenance was submitted top <br />RCWD. <br />v Met with contractor — work will be scheduled for this winter <br />2 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.