Laserfiche WebLink
Res 1335-21 <br />Page 4 of 5 <br />4. Site Data: <br />Lot 1 and Lot 2, Block 1, Anthony Properties Second Addition, shall be inclusive of the <br />Theater Site (7.40 acres). <br />5. Dimensional Requirements: <br />Parking Requirements for the Theater shall exclude Lot 1, Block 1, Anthony Properties <br />Second Addition, which consists of a reduction of 34 stalls. Lot 1 (Caribou) shall have <br />shared parking on Lot 2 (Theater), specifically for employees, and/or overflow customer <br />parking. <br />10. Landscaping; Highway 10 Design Theme: <br />References to a 15' easement adjacent to Highway 10 (Mounds View Boulevard), shall <br />be amended to a 25' easement across Lot 1 and Lot 2, Block 1, Anthony Properties <br />Second Addition. The intent of this easement is to implement a Highway 10 Design <br />Theme. <br />17. Signage: <br />Signage specific to Lot 1, Block 1, Anthony Properties Second Addition, shall be <br />approved as part of this Resolution. Any sign replacement or modification, shall be <br />consistent with the intent of this Resolution, or the O'Neil Property PUD Narrative. If <br />there is any discrepancy between the two, then any sign alteration shall comply with the <br />Municipal Code, as interpreted by City Staff. <br />21. Platting & Easements: <br />References to a 15' easement adjacent to Highway 10 (Mounds View Boulevard), shall <br />be amended to a 25' easement across Lot 1 and Lot 2, Block 1, Anthony Properties <br />Second Addition. The intent of this easement is to implement a Highway 10 Design <br />Theme. <br />NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Mounds View <br />Planning Commission recommends approval of the Development Review for Caribou Cabin, <br />with the following conditions: <br />1. The Site Plan, dated June 16, 2021, is deficient in parking specifically for Caribou Cabin <br />employees. The Developer shall submit evidence of an agreement with the theater owner <br />and operator for shared parking on the theater parking lot. This agreement shall be <br />provided to the City and administratively approved, prior to issuance of a Building Permit <br />on Lot 1 (Caribou Cabin). <br />2. The project shall be constructed consistent with Construction Plans, dated June 11, 2021, <br />and Sign Schedule, dated March 12, 2021. The Landscape Plan shall be amended from 3 <br />Ornamental Trees, to 4 Ornamental Trees. <br />The Developer shall submit a Tree Preservation Plan, in compliance with Municipal <br />Code, Section 160.415 thru 160.418. Any tree trimming or removal shall be coordinated <br />with the City Arborist, and obtain permits from Ramsey County, if applicable. <br />