My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-27-2021 EDA
MoundsView
>
Commissions
>
Economic Development Authority
>
Agenda Packets
>
2020-2029
>
2021
>
09-27-2021 EDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 9:16:19 AM
Creation date
9/23/2021 1:49:48 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
Economic Development Authority
Commission Doc Type
Agenda Packets
MEETINGDATE
9/27/2021
Commission Doc Number (Ord & Res)
0
Supplemental fields
Date
9/27/2021
EDA Document Type
Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A3 Page 13 <br />Agreement between the City of Mounds View and Center for Energy and Environment <br />DOCSOPEN\MU205\13\748240.v2-9/15/21 <br />improvements. To make equipment upgrades or purchase other capital materials that are intended to <br />sustain the business in the long-term, including but not limited to: HVAC, solar, plumbing, electrical, <br />lighting, insulation, flooring, remodeling or other permanent physical interior improvements. <br />Ineligible Use of Funds: Program loan proceeds may not be used for costs related to any City fees that <br />are required to facilitate Business Improvements, e.g., building permits, zoning application fees. <br />Additionally, Program loan proceeds may not be used to purchase commercial inventory or other <br />materials that are not intended to sustain the appearance or functionality of the business in the long- <br />term. Payment for work initiated prior to the loan being approved and closed, unless due to emergency. <br />Questionable improvements will be brought to the EDA. <br />Bids: Only one bid is required. All contractors must be properly licensed. <br />Sweat Equity Labor: Work may be performed by property owners on a “sweat equity” basis. Loan <br />funds may be used only for the purchase of materials and not to compensate for labor. Loan funds can <br />be used to rent tools/ equipment. <br />Post Installation Inspection: Permits must be obtained and signed off by a City inspector where <br />required; when not required, a post installation inspection will be performed by CEE to ensure the work <br />has been completed before any funds will be released. <br />Loan Security: None. <br />Borrower Fees: None. <br />Work Completion: All work must be completed within six (6) months of the loan closing. However, <br />when warranted, exceptions may be made on a case by case basis. <br />General Program Conditions <br />Application Processing: Loans will be distributed on a first come first serve basis as applicants qualify. <br />Applicants must provide a completed application package including the following in order to be <br />considered for funding. <br />Completed and signed application form <br />Proof of income <br />Bids or estimates for proposed projects <br />Other miscellaneous documents CEE may require <br />Contractors/Permits: Contractors must be properly licensed. Permits must be obtained when required <br />by City ordinance. <br />Program Costs: Loan origination, post installation inspection and remodeling advisor visit fees will be <br />paid per the Program Budget. Loan program marketing efforts will be billed directly to the City of <br />Mounds View EDA and is a separate expense should the City of Mounds View EDA choose to commission <br />CEE for marketing support. Borrowers will pay all mortgage filing fees and related closing costs.
The URL can be used to link to this page
Your browser does not support the video tag.