Laserfiche WebLink
I <br />o� <br />0 <br />o X°13 <br />N <br />O <br />0 <br />0 <br />Inv-885.94 NE \\ <br />o Inv=885.59 NW/SE �'� a6 <br />ro <br />892. <br />N <br />N <br />e99 Lrl <br />CBR <br />Rim=891.44 X\Po <br />A <br />Inv=886.04 SW --- <br />< 00 897 <br />T�2 8942?9' <br />8g� J <br />- l `89767 <br />4 <br />c�G <br />B9 <br />eyo�0 <br />\\MH <br />Im=890.22 <br />A <br />INV= _ <br />889.33 - <br />/ <br />o <br />0 <br />LANDSCAPE NOTES: <br />212.74 -"7 <br />/ <br />i <br />/ <br />/ <br />/ <br />/ <br />g94.93 X <br />893.98 t of W ay k'1Muttlp\e <br />-- (of O d Nwy ; B per 141 5 <br />N.LS° 42 553 4z <br />cs• <br />ONS <br />X Inv 891 54 E RCP <br />2v=898.08 <br />6 05„E 84^_ Ali► T51 6,r' <br />515°� ��-�i7'� / iG.89817 .g= a9 J� t-t- <br />ci1=896�3 - <br />X 696'd0 <br />F I <br />°1 � <br />e. 1007 J S�1y�_A <br />l'Ir-" �-�� sly <br />TO <br />„. <br />" „ <br />- C.L Fence on Property Line ti5Y <br />00'^� <br />Shed <br />CL I X g9a5' `^' 69 <br />898.29 X -I �rj6'VV 20� <br />897.29 R mR 897.54 --_ NO9r� -9 - - <br />Inv=887.44 NW/SE <br />. 697.54 <br />4111111., <br />1 <br />S00°36'2 ' <br />5695 <br />QB <br />APPRX <br />EOF=893.50 <br />1 - RB <br />1. WHERE SHOWN, SHRUB & PERENNIAL BEDS SHALL BE MULCHED WITH 4" DEPTH (MINIMUM AFTER INSTALLATION AND/OR TOP DRESSING <br />OPERATIONS) OF SHREDDED CEDAR MULCH. <br />2. ALL TREES SHALL BE MULCHED WITH SHREDDED CEDAR MULCH TO OUTER EDGE OF SAUCER OR TO EDGE OF PLANTING BED, IF APPLICABLE. <br />ALL MULCH SHALL BE KEPT WITHIN A MINIMUM OF 2" FROM TREE TRUNK. <br />3. IF SHOWN ON PLAN, RANDOM SIZED LIMESTONE BOULDERS COLOR AND SIZE TO COMPLIMENT NEW LANDSCAPING. OWNER TO APPROVE <br />BOULDER SAMPLES PRIOR TO INSTALLATION. <br />4. PLANT MATERIALS SHALL CONFORM WITH THE AMERICAN ASSOCIATION OF NURSERYMEN STANDARDS AND SHALL BE OF HARDY STOCK, FREE <br />FROM DISEASE, DAMAGE AND DISFIGURATION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING PLUMPNESS OF PLANT MATERIAL FOR <br />DURATION OF ACCEPTANCE PERIOD. <br />5. UPON DISCOVERY OF A DISCREPANCY BETWEEN THE QUANTITY OF PLANTS SHOWN ON THE SCHEDULE AND THE QUANTITY SHOWN ON THE <br />PLAN, THE PLAN SHALL GOVERN. <br />6. CONDITION OF VEGETATION SHALL BE MONITORED BY THE LANDSCAPE ARCHITECT THROUGHOUT THE DURATION OF THE CONTRACT. <br />LANDSCAPE MATERIALS PART OF THE CONTRACT SHALL BE WARRANTED FOR ONE (1) FULL GROWING SEASONS FROM SUBSTANTIAL <br />COMPLETION DATE. <br />7. ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL RECEIVE 4" LAYER TOPSOIL AND SOD AS SPECIFIED UNLESS OTHERWISE NOTED <br />ON THE DRAWINGS. <br />8. COORDINATE LOCATION OF VEGETATION WITH UNDERGROUND AND OVERHEAD UTILITIES, LIGHTING FIXTURES, DOORS AND WINDOWS. <br />CONTRACTOR SHALL STAKE IN THE FIELD FINAL LOCATION OF TREES AND SHRUBS FOR REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT <br />PRIOR TO INSTALLATION. <br />9. ALL PLANT MATERIALS SHALL BE WATERED AND MAINTAINED UNTIL ACCEPTANCE. <br />10. REPAIR AT NO COST TO OWNER ALL DAMAGE RESULTING FROM LANDSCAPE CONTRACTOR'S ACTIVITIES. <br />11. SWEEP AND MAINTAIN ALL PAVED SURFACES FREE OF DEBRIS GENERATED FROM LANDSCAPE CONTRACTOR'S ACTIVITIES. <br />12. REPAIR AT NO COST TO THE OWNER IRRIGATION SYSTEM DAMAGED FROM LANDSCAPE CONSTRUCTION ACTIVITIES. <br />13. PROVIDE SITE WIDE IRRIGATION SYSTEM DESIGN AND INSTALLATION. SYSTEM SHALL BE FULLY PROGRAMMABLE AND CAPABLE OF ALTERNATE <br />DATE WATERING. THE SYSTEM SHALL PROVIDE HEAD TO HEAD OR DRIP COVERAGE AND BE CAPABLE OF DELIVERING ONE INCH OF <br />PRECIPITATION PER WEEK. SYSTEM SHALL EXTEND INTO THE PUBLIC RIGHT-OF-WAY TO THE EDGE OF PAVEMENT/BACK OF CURB. <br />14. CONTRACTOR SHALL SECURE APPROVAL OF PROPOSED IRRIGATION SYSTEM INLCUDING PRICING FROM OWNER, PRIOR TO INSTALLATION. <br />LANDSCAPE CALCULATIONS: <br />N <br />0 <br />X 0 6z <br />894.68 <br />894.84 <br />g0p • <br />66 X <br />�g <br />Landscaping Requirements <br />Building Footprint <br />(Square Feet) <br />Site Perimeter <br />(Linear Feet) <br />Total Plants <br />(Building Footprint) <br />Total Plants <br />(Site Perimeter) <br />Total Replacement Plants <br />(from tree preservation) <br />One overstory deciduous shade tree for every 2,000 square feet of the <br />total building footprint, <br />29,721 <br />2,432 <br />15 <br />10 <br />One coniferous tree for e1,ery 2,000 square feet of building or one <br />coniferous tree for every 200 feet of site perimeter, whichever is greater, <br />29,721 <br />2,432 <br />15 <br />12 <br />One understory shrub for every 300 square feet of building or one shrub <br />for every 30 feet of site perimeter, whichever is greater <br />29 721 <br />2,432 <br />99 <br />81 <br />One omamental tree for every 2,000 square feet of building or one <br />ornamental tree for every 200 feet of site perimeter, whichever is greater, <br />29,721 <br />2,432 <br />15 <br />12 <br />In the evemt a site plan layout does not have adequate space to accommodate plant quantities as required herein, such quantities per species can be reduced, provided that the total <br />required height or caliper is maintained. The Community Development Director and City Forester must approve changes. <br />S89°57'22"W 385.00 <br />42 N <br />N re): <br />6°j7 <br />oo <br />z <br />U <br />N� <br />a_ li <br />a <br />.v <br />C I <br />(n , <br />v <br />co it <br />8 <br />o <br />In <br />X 9 01 3 <br />90234 X <br />98gp - 108 <br />IRRIGATION NOTES: <br />� .s <br />I <br />�-3 <br />V "�YO • esl <br /><y,J\dthvaC� <br />� � PUb��c Rlwl <br />(P / <br />i <br />i <br />o <br />0.03-gp463 X <br />0 gOz g3 <br />-R-a968,3w. <br />-w <br />,w-- <br />-w-� <br />/ <br />8 <br />/ <br />v av�esl <br />/ J.0�c \I\1) �\d90 .25 X <br />1p, P <br />9p6,,o X _ z�'p7'3y <br />9p 65 iaT.C�'CV'g06 6 <br />w' c <br />/ <br />907.84 X <br />OBR 901 0 <br />\r6e 69� <br />' <br />,w- <br />j << <br />.w' <br />w 1$ �03 9 o <br />w% <br />ids <br />t� �i <br />/ lAIL <br />--C.L ence W of Property No.„„,.. <br />9,555 X <br />Gec <br />N05°18'42"W 633.83 <br />„E 645 30 <br />/ <br />1. <br />ENTIRE SITE SHALL BE FULLY IRRIGATED. THE CONTRACTOR SHALL SUBMIT IRRIGATION SHOP DRAWINGS FOR REVIEW AND <br />APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. <br />2. SEE MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS FOR IRRIGATION WATER, METER, AND POWER CONNECTIONS. <br />3. CONTRACTOR TO VERIFY LOCATION OF ALL UNDERGROUND/ABOVE GROUND FACILITIES PRIOR TO ANY EXCAVATION/INSTALLATION. <br />ANY DAMAGE TO UNDERGROUND/ABOVE GROUND FACILITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND COSTS <br />ASSOCIATED WITH CORRECTING DAMAGES SHALL BE BORNE ENTIRELY BY THE CONTRACTOR. <br />4. SERVICE EQUIPMENT AND INSTALLATION SHALL BE PER LOCAL UTILITY COMPANY STANDARDS AND SHALL BE PER NATIONAL AND <br />LOCAL CODES. EXACT LOCATION OF SERVICE EQUIPMENT SHALL BE COORDINATED WITH THE LANDSCAPE ARCHITECT OR <br />EQUIVALENT AT THE JOB SITE. <br />5. CONTRACTOR SHALL COORDINATE WITH LOCAL UTILITY COMPANY FOR THE PROPOSED ELECTRICAL SERVICE AND METERING <br />FACILITIES. <br />6. IRRIGATION WATER LINE CONNECTION SIZE IS 1%" AT BUILDING. VERIFY WITH MECHANICAL PLANS.COVAGE. <br />7. ALL MAIN LINES SHALL BE 18" BELOW FINISHED GRADE. <br />8. ALL LATERAL LINES SHALL BE 12" BELLOW FINISHED GRADE. <br />9. ALL EXPOSED PVC RISERS, IF ANY, SHALL BE GRAY IN COLOR. <br />10. CONTRACTOR SHALL LAY ALL SLEEVES AND CONDUIT AT 2'-0" BELOW THE FINISHED GRADE OF THE TOP OF PAVEMENT. EXTEND <br />SLEEVES TO 2'-0" BEYOND PAVEMENT. <br />11. CONTRACTOR SHALL MARK THE LOCATION OF ALL SLEEVES AND CONDUIT WITH THE SLEEVING MATERIAL "ELLED" TO 2'-0" ABOVE <br />FINISHED GRADE AND CAPPED. <br />12. FABRICATE ALL PIPE TO MANUFACTURE'S SPECIFICATIONS WITH CLEAN AND SQUARE CUT JOINTS. USE QUALITY GRADE PRIMER <br />AND SOLVENT CEMENT FORMULATED FOR INTENDED TYPE OF CONNECTION. <br />BACKFILL ALL TRENCHES WITH SOIL FREE OF SHARP OBJECTS AND DEBRIS. <br />ALL VALVE BOXES AND COVERS SHALL BE BLACK IN COLOR. <br />GROUP VALVE BOXES TOGETHER FOR EASE WHEN SERVICE IS REQUIRED. LOCATE IN PLANT BED AREAS WHENEVER POSSIBLE. <br />IRRIGATION CONTROLLER LOCATION SHALL BE VERIFIED ON -SITE WITH OWNER'S REPRESENTATIVE. <br />13. <br />14. <br />15. <br />16. <br />17. <br />CONTROL WIRES: 14 GAUGE DIRECT BURIAL, SOLID COPPER IRRIGATION WIRE. RUN UNDER MAIN LINE. USE MOISTURE -PROOF <br />SPLICES AND SPLICE ONLY AT VALVES OR PULL BOXES. RUN SEPARATE HOT AND COMMON WIRE TO EACH VALVE AND ONE (1) <br />SPARE WIRE AND GROUND TO FURTHEST VALVE FROM CONTROLLER. LABEL OR COLOR CODE ALL WIRES. <br />18. AVOID OVER SPRAY ON BUILDINGS, PAVEMENT, WALLS AND ROADWAYS BY INDIVIDUALLY ADJUSTING RADIUS OR ARC ON <br />SPRINKLER HEADS AND FLOW CONTROL ON AUTOMATIC VALVE. <br />19. ADJUST PRESSURE REGULATING VALVES FOR OPTIMUM PRESSURE ON SITE. <br />20. USE SCREENS ON ALL HEADS. <br />21. A SET OF AS -BUILT DRAWINGS SHALL BE MAINTAINED ON -SITE AT ALL TIMES IN AN UPDATED CONDITION. <br />22. ALL PIPE 3" AND OVER SHALL HAVE THRUST BLOCKING AT EACH TURN. <br />23. ALL AUTOMATIC REMOTE CONTROL VALVES WILL HAVE 3" MINIMUM DEPTH OF 3/4" WASHED GRAVEL UNDERNEATH VALVE AND <br />VALVE BOX. GRAVEL SHALL EXTENT 3" BEYOND PERIMETER OF VALVE BOX. <br />24. THERE SHALL BE 3" MINIMUM SPACE BETWEEN BOTTOM OF VALVE BOX COVER AND TOP OF VALVE STRUCTURE. <br />/ <br />A/ <br />'vv <br />X 43' w <br />eGlw' <br />f <br />9(09 X \ `Pet �w./'/ i$'skc? <br />w-� <br />SUE] 9LGEILL <br />N <br />974 <br />2S <br />SVO S10e121LL <br />Na010E>19m8]2310al <br />W <br />5 <br />X <br />€j <br />�g0 <br />g <br />/ <br />h <br />• <br />X <br />/ <br />/ <br />CBR <br />Rim=907.05 __ <br />Inv=901.75 SW <br />Inv=899.05 N/S <br />/ <br />X g01 <br />w- <br />eYva ^ <br />�hU <br />G� <br />g07 <br />9p7�.�� <br />.57- <br />t <br />_ I <br />/ 2� <br />X 006 °N / <br />�1397 <br />CONSTRUCTION LIMI <br />5438 <br />5439 <br />\ <br />Existing Building <br />LEGEND <br />X <br />►, <br />55 <br />69 <br />901 66 <br />X 90° 'w <br />w' <br />1 - CA2 <br />GP <br />.05 <br />5 <br />900 <br />676 <br />J'g0% <br />110 <br />I <br />�6 <br />S89°55'23"W 504 <br />,90 <br />GC <br />Know what's below. <br />Call before you dig. <br />• <br />Civil Engineering ° Surveying ° Landscape Architecture <br />4931 W. 35th Street, Suite 200 <br />St. Louis Park, MN 55416 <br />PROJECT <br />4889 OLD HIGHWAY 8, MOUNDSVIEW, MN 55112 <br />7645 LYNDALE AVE S, MINNEAPOLIS, MN 55423 <br />I HEREBY CERTIFY THAT THIS PLAN, <br />SPECIFICATION, OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT <br />SUPERVISION AND THAT I AM A DULY <br />LICENSED LANDSCAPE ARCHITECT UNDER <br />THE LAWS OF THE STATE OF MINNESOTA. <br />Pa -trick J. Sarver <br />DATE 09/30/21 LICENSE NO. 24904 <br />ISSUE/SUBMITTAL SUMMARY <br />DATE <br />DESCRIPTION <br />09/30/21 <br />CITY SUBMITTAL <br />DRAWN BY:XX REVIEWED BY: XX <br />PROJECT NUMBER: XXXXX <br />REVISION SUMMARY <br />DESCRIPTION <br />LANDSCAPE PLAN - <br />OVERALL SITE <br />COPYRIGHT 2021 CIVIL SITE GROUP INC. <br />