Laserfiche WebLink
SWM Utility Rate Charge, 1-1 Industrial <br />$92-.83 99.33 per acre per quarter <br />SWM Utility Rate Charge, PUD Planned Unit <br />Development <br />$105�8112.65 per acre per quarter <br />SWM Utility Rate Charge, CRP Conservancy, <br />Recreation and Preservation <br />$1 4-9915.00 per acre per quarter <br />SWM Utility Rate Charge, School or Church, <br />Public or Private <br />$42 72 45.71 per acre per quarter <br />Storm Water Management (The permit fee schedule adopted 08/24/2016 by the Rice Creek <br />Watershed District Board. The fee for a permit is the cumulative total of all individual aspects of a <br />project. Government entities are exempt from the permit fees). <br />Rule C (Storm water Management): <br />Single lot, single family residential projects <br />Home, Accessory Structure, Driveway, 150 <br />Etc. <br />Residential Commercial Industrial Institutional Develo ment <br /><1 acre of new or reconstruction <br />impervious surface <br />$1,000 <br />1-2.5 acres of new or reconstructed <br />impervious surface <br />$2,000 <br />2.5-5 acres of new or reconstructed <br />impervious surface <br />$3,500 <br />>5 acres of new or reconstructed <br />impervious surface <br />$5,000 plus $1,000 per acre (capped at $10,000) <br />Rule D (Erosion Control Plans): <br /><2.5 acres of land disturbance <br />100 <br />2.5-10 acres of land disturbance <br />IL50 <br />>10 acres of land disturbance <br />500 <br />Rule E Flood lain Alteration <br />No mitigation required <br />No fee <br />Mitigation required <br />I 100 <br />Rule F (Wetland Alteration) <br />Exemption <br />250 <br />< 1 acre of miti ation re uired <br />875 <br />1-5 acres of mitigation required <br />$1,750 <br />5-10 acres of mitigation required <br />$3,500 <br />>10 acres <br />J§250 <br />Banking Plan <br />JjJ50 <br />Rule G (Regional Conveyance Systems): <br />500 <br />Rule I Public Drainage S stems : <br />500 <br />Note: An action that requires a permit under both Rule G and Rule I will be subject under those rules <br />to a single permit fee of $500. Additionally, if the action is one for which a bond for costs has been <br />provided under MN Statute 103E, a Rule G/Rule I <br />fee will not be required. <br />Rule J (Appropriate of Public Water): <br />No fee <br />Rule L (Variances): <br />Variable. See District Permit Variance Guidance <br />Policy <br />Storm Water Connection/Repair/Disconnect <br />100 plus surchar e <br />Storm Water Inspection or re -inspection after <br />Call -out rate per visit (Minimum 2 hours) <br />hours <br />Street Lighting Utility Fees (Gha 4-Title XV,-Chapter 152.018) <br />Construction Site and Land Disturbance Fees ( Title XV, Chapter 156.006) <br />Additional Fees May be Required for Legal and En ii eering Costs Incurred by the City. <br />Call -Out Charge for Contractor Negligence (Lack <br />of Maintenance, Traffic Signs, Etc.) <br />Call -out rate per visit (Minimum 2 hours) plus <br />cost(s)* of any materials required to remedy the <br />issue. *TBD by the Director of Public Works/Parks <br />and Recreation <br />A copy of the ordinance is available online at the City's website at <br />www.moundsviewmn.ora. <br />SECTION 3. This ordinance shall take effect and be in force 30 days from and after its passage <br />and publication, in accordance with Section 3.09 of the City Charter. <br />Introduction and First Reading by the Mounds View City Council on November 8, 2021. <br />Second Reading and Adoption by the Mounds View City Council on November 22, 2021. <br />The Mounds View Vision <br />A Thriving Desirable Community <br />