Laserfiche WebLink
ORDINANCE NO.982 <br />CITY OF MOUNDS VIEW <br />COUNTY OF RAMSEY <br />STATE OF MINNESOTA <br />AN ORDINANCE AMENDING TITLE III, CHAPTER 37, SECTION 37.060(B) AND <br />TITLE IX, CHAPTER 92, SECTION 92.999 OF THE MOUNDS VIEW MUNICIPAL <br />CODE REGARDING PUBLIC IMPROVEMENTS AND PARKS AND RECREATION <br />THE CITY OF MOUNDS VIEW ORDAINS: <br />SECTION 1. The City Council of the City of Mounds View hereby amends Title III, Chapter 37, <br />Section 37.060(B) of the Mounds View Municipal Code by adding the underlined material and <br />deleting the stfiekerl material as follows: <br />(B) Methods of reconstruction. <br />(1) General. The following are methods of street reconstruction and rehabilitation, which <br />will be utilized by the city in considering future projects and assessments. It will be noted that <br />the design standard for either reconstruction or rehab will be the current design of the street <br />section. Projects may be constructed to higher designs if warranted and/or approved by the City <br />Council. <br />(2) Improvement type and apportionment of cost. <br />(a) Street reconstruction including curb and gutter. The cost of street reconstruction shall <br />be reeover-ed by the adjusted 4ont footage niethed. The ffent footage fate shall be detefmined b <br />dividing the project, eest by the total number- of adjusted f�ont feet in the pfojeet area. Th <br />assessm Led ffent foot may vary depending on the undef!)4ng zoning of a par -eel. <br />Assessments fnr r d t' 1 -1,' me on eeto - ., arterial � (NA <br />r r t' h ll <br />��+ .,.,..� �4S�, urrt� <br />read) shall be assessed for- 0 of the pavemeat surfaee and base, up to a width of 26 feet, <br />equally divided by both sides of the street. This amount shall not exeeed $14.60 per- front foot. <br />recovered on a project -by -project basis, as determined by the City Council. <br />1. Non -collector street. Residential property owners will may be assessed for the cost <br />of the pavement and base for the front footage side of the property per direction of the City <br />Council, which shall be determined on a project -by -project basis., whieh shallot exeeed <br />$14.60 per frontage foot. This amount will be adjusted annually by feseltition, in aeeofdanee <br />with the Engineering News Reeor-d (ENR). <br />2. Residents requesting curb and gutter. Any required storm sewer and/or installation of <br />sidewalks/trails on a construction project will may be assessed up to 25% of the total cost of the <br />project additions, which will include engineering, additional removals, base and all other <br />associated expenses. All additional project requests shall may be assessed at 25% of the total <br />costs associated with the improvements. Notwithstandiny- the fore2oin% all assessments shall <br />be subject to the special benefit limitation to the extent required by state law. <br />3. Application. One hundred percent of the turn back funds received from the county <br />will be applied to the new construction or pavement cost of the road that was received. The <br />